Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
how to design a simply supported rectangular concrete beam having cross section of 20 mm by 40 mm and a length of 3 meters that couldcarry a uniform load of 1000 KN
A compressible clay layer 10.0m thick has an initial void ratio in situ of 1.026. Tests and computations show that the final void ratio of the clay layer after construction of a structure is 0.978. Determine the estimated primary consolidation set..
If the quantity of ash released from the power plant each minute were to be eventually despersed in 4,000,000 m^3 of air at 25 degrees Celsius and 1 atm, what would be its concentration expressed in ppm
compute normal and critical depths in a concrete culvert(n=0.015)with a diameter of 36in.and a bed slope of 0.002ft/ft if the design discharge is 15cfs.is the slope steep or mild?reap for S= 0.02ft/ft.
A force of 1.25x103N is required to lift an object that is under the influence of an acceleration due to gravity of 7.66ft/sec2. What is the object's mass in kilograms?
1.How long is the irrigation boom (in feet) from the center pivot to its farthest extent. 2.If the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 4 days.
During the following day the sun melts the ice cover. Determine the new depth if the flow rate remains the same and the surface roughness of the ice is essentially the same as that for the bottom and sides of the river.
Swimmer A immediately starts walking toward B at a speed of 2ft/s relative to the raft. Knowing that the raft weighs 300 lb, determine (a) the speed of the raft if B does not move, (b) the speed with which B must walk toward A
A surveyor is going to take a 5.5 mile sight across a lake from the top of one tower to a target on the top of another tower. It is desired to keep the line of sight 6 ft above the lake surface.
A finished 2 x 4 timber (actual size 1 5/8 in. x 3 1/2 in. x 10 ft long) is used as a fixed-end, fixed-end column. If the modulus of elasticity for the timber is 1600 ksi and a factor of safety of 3 with respect to failure by buckling is specified
incoming wastewater , with BOD5 equal to about 200mg/l is treated in well-run secondery treatment plant remove 90 percent of the BOD. you are to run five-day BOD test with a stander 300-ml bottle , using mixture of treated sewage and dilution wate..
In each experimental run, the concen tration of free available chlorine was varied and the time required to kill 99% of the organisms was determined. The results showed that a CT value of 200 min mg/L was sufficient to achieve a 2-log removal.
A wastewater treatment plant uses an activated sludge process for secondary treatment of 0.300 cubic meters / second of primary effluent. The mixed liquor has a concentration of 2,100mg VSS/L, and the RAS concentration is 10,000mg VSS/L.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd