How much will the layout improvement be worth

Assignment Help Operation Management
Reference no: EM13254593

The cost of improving office layout is $27.000 to be treated as a one-time expense. The office manager does not have any way of estimating improved profits resulting from quality change but says that the new layout will save time and miles of walking for the 40 office employees. She estimates that the new layout will cut the amount of walking for the average employee by 100 miles per year. How much will the layout improvement be worth?

Reference no: EM13254593

Questions Cloud

Find the speed of cart after the collision. : A cart of mass M1 = 5.00 kg and initial speed = 4.00 m/s collides head on with a second cart of mass M2 = 3.00 kg at rest. find the speed of M2 after the collision
How did the organization successfully leverage this strategy : Identify an existing organization that established sustained market leadership by successfully leveraging a generic strategy. How did the organization successfully leverage this strategy?
A plain piece of insulation board : A plain piece of insulation board is used to reduce the heat loss from a hot furnace wall into the room. One surface of the board is at 100°C and the other surface is at 20°C
Find the electrostatic potential in all radial regions : Yoy are presented with a coaxial cable of length L. The inner core has a uniform charge distrubution throughout its radius, Find the Electrostatic Potential in all radial regions
How much will the layout improvement be worth : She estimates that the new layout will cut the amount of walking for the average employee by 100 miles per year. How much will the layout improvement be worth?
Obtain the speed of light in the material : A beam of light is traveling in air and strikes a material. The angles of incidence and refraction are 58.8°, Obtain the speed of light in the material
Determine the heat flux through the wall : In a mutlilayered rectangular walll, the thermal resistance of the fi rst layer is 0.005°C/W, the resistance of the second layer is 0.2°C/W, and for the third layer it is 0.1°C/W. The overall temperature gradient in the multilayered wall from one sid..
What is the makespan and machine idle time : Sequence the jobs shown below by using the Gantt chart. Assume that the move time between machines in one hour. Sequence the jobs in priority order 1,2,3,4.
Write an illustration essay : Illustration Essay For assignment you will write an illustration essay - how your favorite team or player received their current standing or ranking.

Reviews

Write a Review

Operation Management Questions & Answers

  Particular process in any organization

Write a two page summary on a particular process in any organization.

  Is there a secondary reason as well

What Is The Primary Reason People Buy And Own Major Appliance Such As Washing Machine. Is there a secondary reason as well?

  What are the primary factors that play a role

How can application of the training objectives be sustained? What are some of the challenges? The paper must use APA style as outlined in the approved APA style guide.

  What are the chief elements of the strategy

What are the chief elements of the strategy that Whole Foods Market is pursuing?

  Compute l and lq for the number of trunk

the probability exceeds 95% that the time the message spends in the buffer is less than 60 sec. Compute L and Lq for the number of trunk lines you determined.

  Abc airlines has calculated the total costs

ABC Airlines has calculated the total costs (fixed and variable) for the passenger service flights between Los Angeles, California and Orlando, Florida.

  Elucidate what should nancy bush do

she fears which the supervisors will be biased towards making the component in house, as they tend to favour retaining more work for their people. Elucidate what should Nancy Bush do.

  What would be the increase in productivity be

An operation has a 20 percent scrap rate. As a result, 80 pieces per hour are produced.

  What is the reliability of the bank loan processing system

A bank loan processing system has three components with individual reliabilities as shown: R1 = 0.97 R2 = 0.97 R3 = 0.98 What is the reliability of the bank loan processing system? (Round your answer to 4 decimal places, the tolerance is +/-0.0005..

  Develop an aggregate plan

Forrester and Cohen is a small accounting firm, managerd by Joseph Cohen since the retirement in December of his parnter Brad Forrester. Cohen and his 3 CPA's can together bill 640 hours per month.

  Describe an area of improvement for your company or industry

Describe an area of improvement for your company or industry of choice. Find two benchmarks for your improvement area.

  In what ways does achievement of csr goals

In what ways does achievement of CSR goals and objectives strategically differentiate an organization?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd