Assume that the energy contained in coal is about 10,000 Btu/lbm. An electrical power plant burning coal has an output capacity of 1200 MW and the plant converts about 30% of the input energy to electricity. How many short tons of coal are required by this plant per year, assuming it operates continuously? If 10% of the coal mass remains as residual ash, how many tons will develop in the ash pile over 25 years?

Reference no: EM13312355

Questions Cloud

Compute the wavelength corresponding to the frequencies : Provided that the amplitude is sufficiently great, the human ear can respond to longitudinal waves over a range of frequencies from about 20 Hz to about 20000Hz. Compute the wavelength corresponding to these frequencies
Determine what is the rotors angular velocity one minute : The rotor of an electric generator is rotating at 200 when the motor is turned off. Due to frictional effects, the angular acceleration of the rotor after the motor is turned off is α=-0.01ω rad/s^2
Explain nucleophile in polar protic solvents : Which of the following is the strongest nucleophile in polar protic solvents? Can you please explain why A) (CH3)2P- B) (CH3)2N- C) CH3O- D) CH3S-
Determine the horizontal distance the shot travels : The angle of the release is 30 degrees. Determine the horizontal distance the shot travels from the point of release to the point where it hits the ground.
How many short tons of coal are required by plant per year : Assume that the energy contained in coal is about 10,000 Btu/lbm. An electrical power plant burning coal has an output capacity of 1200 MW and the plant converts about 30% of the input energy to electricity.
Explain the ph of a buffer solution made by mixing : What is the pH of a buffer solution made by mixing 150mL of 0.200 M acetic acid and 150 mL of 0.100 M sodium acetate
Michelle dietrich, president of mobile manufacturing : Michelle Dietrich, president of Mobile Manufacturing, Inc. (MM), stared out of her third-floor window at the traffic below her San Jose, California office and said to herself, "This new product has to be right. If we can't gain back a significant sha..
What is the role of the project manager : Discuss why many information technology professionals may overlook project cost managment and how this might affect completing projects within budget.
Determine the forces fx and fy necessary to hold the pipe : Water flows steadily through a horizontal 30 degree upward bend. The inlet diameter is 0.3 m, the velocity is 12 m/s, and the pressure is 128 kpa gage. The outlet diameter is 0.38 m and the pressure is 145 kpa gage.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the specific gravity of the soil solids

A soil has a moisture content of 31.4%, a degree of saturation of 90% and a unit weight of 17.3kN/m^3. Determine the specific gravity of the soil solids.

  Determine the stresses acting on an element oriented

An element in plane stress is subjected to stresses sigma x=27 MPA,sigma y=14 MPA,sigma xy=6MPA.Using mohr's circle,determine the stresses acting on an element oriented at an angle 40 degrees from the x axis.

  Determine the aeration period and f by m ratio

Two activated sludge aeration tanks in Podunk, MO are operated in series. Each tank has the follwing dimensions: 7.0 m wide x 28.0 m long x 3.5 m effective liquid depth.

  Hydraulic radius of the river

In that season, what are the hydraulic radius of the river, its mean velocity and volumetric discharge?

  Length of contracted rectangular weir

A trapezoidal canal 6m wide at the bottom and having a side slope of 1V:2H carries water with a mean velocity of 1.0m/s to a depth of 60cm. What length of contracted rectangular weir 1.0m high should be placed at the middle of the canal to make th..

  Design a cantilever

Need to design a cantilever retaining wall 8m high, saturated unit weight is 16kn/m 3 , surcharge is 7kn/m 2 , load above wall supported on wall stem

  How far in advance of the curve must the sign be located

Drivers must slow down from 65 miles per hour to 55 miles per hour to negotiate a severe curve on a rural highway. A warning sign for the curve is clearly visible for a distance of 110 feet.

  What is the mass of the fish

A fish hanging from the bottom of the spring oscillates vertically at a frequency of 2.00 Hz. Ignoring the mass of the spring, what is the mass of the fish?

  Estimate the volume of soil

A proposed earthen dam will contain 5,000,000 cubic meters of earth. Soil to be taken from a borrow pit will be compacted to a void ratio of 0.78. The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that mu..

  Determine the relative humidity using psychrometric chart

The wet bulb and dry bulb temperatures for humid atmospheric air (at 100 kPa) are measured to be 20 C and 25C respectively. Determine: a. using the psychrometric chart, the relative humidity  b. using the psychrometric chart, the humidity ratio

  Determine what value of n was used in the design

An irrigation channel is constructed of earth and is 8.1km long and has a capacity of 10 m^3/s for a flow depth of 2m. The cross section is trapezoidal with a bid width of 8 m and side slopes of 2 horizontal to 1 vertical.

  Define what are the quantitative measures of reliability

What are the quantitative measures of reliability (discuss measures for hardware, software, personnel, facilities, and data)?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd