How many light bulbs could be lit with the wasted power

Assignment Help Civil Engineering
Reference no: EM13299294

Water discharging into a 10 m wide rectangular horizontal channel from a sluice gate is observed to have undergone a hydraulic jump. The flow depth and velocity before the jumo are 0.8 m and 7 m/s respectively. The flow depth and velocity after the jump are 2.46 m and 2.28 m/s respectivly. Assuming a flat channel, determine:

a) the energy loss due to the jump, hl (head loss)

b) the wasted power production potential due to hydraulic jump (use equation that relates power to flow rate and head)

c) how many light bulbs (each bulb is 60W) could be lit with the wasted power?

Reference no: EM13299294

Questions Cloud

Find which is produced with emphasis on temporal distributn : You are assigned the task of using bioremediation to cleanup a hazardous waste site contaminated with Tetrachloroethylene. The site is a shallow surficial sandy aquifer 30 feet deep underlain by a clay unit. The depth to the watertable is 10ft.
What is the equity value and debt to value ratio : Edwards Construction currently has debt outstanding with a market value of $ 90,000 and a cost of 9 percent. The company has an EBIT of $ 8,100 that is expected to continue in perpetuity. Assume there are no taxes.
Prepare the companys cash budget for october : Prepare the companys cash budget for October in good form.
When and how are eaas used in capital budgeting : What is an "equvalent annual annuity (EAA) ?" When and how are EAAs used in capital budgeting ?
How many light bulbs could be lit with the wasted power : The flow depth and velocity before the jumo are 0.8 m and 7 m/s respectively. The flow depth and velocity after the jump are 2.46 m and 2.28 m/s respectivly. Assuming a flat channel, determine a) the energy loss due to the jump, hl (head loss)
What is a replacement chain : What is a "replacement chain?" When and how should replacement chain be used in capital budgeting ?
What invovement would nonfinancial people : What invovement would nonfinancial people such as those in marketing, accounting, and production have in the analysis ?
How to show the transition on the speecific energy curve : A rectangular channel has water flowing at a depth of 1.6 ft with a corresponding specific energy of 1.736 ft. A step up on the channel bed resulte in the flow becoming critical. The critical depth is 1.29 ft and corresponding specific energy is 1..
Compute the present value of the income stream : Now compute the present value of the income stream from the gold mine at a discount rate of 6%, and at a discount rate of 4%.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the pressure acting on the sand

A 3-ft diameter column with weight of 150 kg is placed on top of 1 m thick aggregate layer. The soil beneath the aggregate layer is sand. The friction angle of the aggregate is 36 degrees and the unit weight is 22 lb/ft3. What is the pressure acti..

  Determine horizontal distance between the points

What is the corresponding horizontal distance between the points - The slop distance 156.777 from one poin to another at rate of+1.5%

  Complete cycle of the motion

Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)

  Give beam deflection solution

Beam Deflection Solution, Derive an expression for the deflection due to shear for a cantilever beam of constant rectangular cross section, under action of a point load, P at free end.

  Waterline of center of gravity

The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the height above the waterline of its center of Gravity (G).

  Calculate the intensity ratio of sorces

two cohernt sources produce interference patern intensity ratio of bright fringe to dark fringe is 9/1. calculate the intensity ratio of sorces.

  Calculate the relative compaction

A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...

  Determine what external force is required to hold the bend

A pipe 1ft in diameter bends through an angle of 135 degrees. The velocity of flow of gasoline ( S = 0.8) is 20ft/s and the pressure is 10psig in the bend. What external force is required to hold the bend against the action of the gasoline

  Calculate the total friction force exerted by the road

A 3220-lb car enters an S-curve at A with a speed of 60 mi/hr with brakes applied to reduce the speed to 45 mi/hr at a uniform rate in a distance of 300 ft measured along the curve from A to B.

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  How fast will it be going when it hits the ground

How fast will it be going when it hits the ground?

  Determine what is the pond depth above the 5 ft

calculate the depth of water in a stormwater pond resulting from a two hour rainfall event. the rainfall occurs over a 24-acre watershed at an average rate of 1 inch/hour. the runoff coefficient is 0.5.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd