How many days will contractor require to complete the work

Assignment Help Civil Engineering
Reference no: EM13307062

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum-size shovel that will excavate 400,000 bcy of common earth in a minimum of 130 working days of 8 hr each. The average height of excavation will be 15 ft, and the average angle of swing will be 120°. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine's maximum digging height is 34 ft. The efficiency factor will be a 45-min hour. Appropriate-size haul units can be used with either shovel. How many days will it require to complete the work?

Reference no: EM13307062

Questions Cloud

What kind of a binary tree is the heap : What kind of a binary tree is the heap? Explain different operations of heaps. Compare heaps to binary search trees in term of efficiencies of main operations.
Find the sum of the array elements : Write a program in machine code to use a subroutine to find the sum of the array elements. For simplicity, assume that the sum of the data values is less than $FF. You do not need to use the BCC to check for carry flag. Follow the following ste..
Challenge creating a national health system : In your opinion, what you do you believe will be our nation's greatest challenge creating a national health system?
Find the broadcast throughput of the network. : Find the broadcast throughput of the network.
How many days will contractor require to complete the work : A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum-size shovel that will excavate 400,000 bcy of common earth in a minimum of 130 working days of 8 hr each.
Egyptians buried with books of going forth by day : Why were Egyptians buried with Books of Going Forth by Day (Books of the Dead)?
What is the lowest maximum cycle temperature at the engine : the pressure ratio across the compressor is 9 and the maximum temperature is 827c.the turbine and comprssor processes are adiabatic with turbine efficiency of 90% and a compressor efficiency of 85%.
Using jk flip-flops design : Using JK Flip-Flops, design and implement a 6-bit shift register with the following  operating features. On receipt of a clock pulse it:
Write a java application called newtetristhat : A user can add tetriminos into the middle band tocreate a meaningful shape. A tetrimino that is no longer useful can be deleted byputting it into the bottom band.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the speed at which the ball is kicked

The ball at A is kicked such that theta=30 degrees. If it strikes the ground at B having coordinates x=15 ft, y= -9ft, determine the speed at which it is kicked and the speed at which it strikes the ground.

  Calculate the velocity and flow rate of acetone at the exit

A tank containing acetone at 20 oC has a drain pipe connected vertically at the bottom. The pipe is made of galvanized iron, 0.5 in NPS Schedule 40 with length L= 2m. The acetone depth in the tank is H= 5 m.

  What would the gross truck mass when loaded to heap capacity

If a truck has a capacity of 24m^3 (Heaped) and 18m^3 (struck), with a total empty weight of 31600kg (truck), and needs to move soil at a density of 1850kg.m^3 (Bank) with a swell of 41%

  Determine what is the maximum daily mass of chloride

The pipe has a flow of 5 m3/s. The stream's chloride concentration just upstream of the pipe's dischage is 12 mg/L, and the runoff pipe's discharge has a chloride concentration of 40 mg/L. Chloride is a conservative substance.

  Determine the equilibrium mole fraction of hcho in air

At equilibrium, the air space has a volume of 1 L, a total pressure of 1 atm, and a temperature of 298 K. The i mg of formaldehyde (HCHO, MW = 30 g/mol) is injected through the septum into the water.

  Write the vector expression for velocity of a as measured

The air transport B is flying with a constant speed of 480 mi/hr in a horizontal arc of 9-mi radius. When B reaches the position, aircraft A, flying south-west at a constant speed of 360 mi/hr

  Which option should to select to maximize the payout

You are the winner of a sweepstakes and given a choice of a one-time payment of $1,000,000 or a guaranteed $80,000 per year for 20 years. Assume that you will collect all 20 years regardless of health condition.

  Cantilever mass-less beam

Consider a cantilever mass-less beam subjected to a concentrated mass at the tip of the beam. Assume, length L, flexural stiffness EI, and mass m.

  Estmate the capacity of the roadway

given s=.30/(60-u), where s is the spacing (space headway) in miles, and u is the speed in miles per hour, derive the relationships u-k, u-q, and q-k. Also, estmate the capacity (qmax) of the roadway.

  Determine the magnitude and direction of the components

The beam is subjected to a force F=825 lb in the direction, and is supported by a pin connection at point B and a rope attached through a pin connection at point A. Problem #1: Draw a complete FBD of the beam.

  Calculate cracking moment for an unreinforced concrete beam

calculate the cracking moment (resisting moment) for an unreinforcedconcrete beam that is 10 in. wide, 16 in. high. assume normal weight concrete with 3000 psi = f prime sub c. use the internal couple method and check with the flexure formula.

  Elevation and stationing of the low point

A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd