Bill builds benches in a small shop and he plans to operate five 8-hour days per week. Each bench has two ends and a top. It takes 5 minutes to cut and sand each end and 3 minutes to make each top. Assembly requires 10 minutes per bench, and painting requires 5 minutes per bench. Bill has one employee who makes the tops and ends. Bill will do the final assembly and painting. He also plans 1 hour per day for setup and teardown for each department.

a. How many benches should he plan to build per week?

b. How many hours per week are required for each person?

c. Suggest ways to increase the number of benches produced per week.

Reference no: EM131235427

Questions Cloud

What should be cost of capital for this corporate division : What should be a reasonable value approximation for this corporate division? - What should be the cost of capital for this corporate division?
Do you feel the strategic compensation procedures discussed : Do you feel the strategic compensation procedures discussed in this case study are a competitive advantage for the organization? Why or why not? What do you think could enhance the tactical compensation decisions discussed in this case study?
Would there be any reduction in manufacturing lead time : In problem 6.12, what would be the manufacturing lead time if the second machine could not be set up until the setup on the first machine was completed? Would there be any reduction in manufacturing lead time?
Hospitality institution to understand it target demographics : Would you agree that it is important for a hospitality institution to understand it's target demographics and market its' services towards that age group? As an example, if you were the manager of a hotel near Disney in Orlando,
How many benches should he plan to build per week : Assembly requires 10 minutes per bench, and painting requires 5 minutes per bench. Bill has one employee who makes the tops and ends. Bill will do the final assembly and painting. He also plans 1 hour per day for setup and teardown for each depart..
Readiness of customer to make a commitment : Describe probing questioning and explain how this leads to verifying the readiness of customer to make a commitment. Provide an example.
How discretionary benefits enhance the work life balance : Discuss companywide incentive plans, comparing and contrasting the two major types. In your opinion, is one better than the other? Discuss the five steps used to develop a pay structure and compare the two types of pay structure variations.
Calculate mean absolute deviation : The monthly sales for Telco Batteries, Inc., were as shown in the excel sheet. Please use 4-month weighted moving average method to forecast the demands from month 5 to month 19. calculate the following measures of the forecast error. a. Mean Absol..
How many ws should be produced in a week : If the rated capacity of the work center is 80 hours, how many Ws should be produced in a week?

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Determine the greatest allowable steam pressure

the moisture content at the turbine exhaust is not to exceed 15%. determine the greatest allowable steam pressure at the turbine inlet and calculate the cycle efficiency.

  A painter is standing on a work platform that is 27 feet

a painter is standing on a work platform that is 27 feet above ground level. for fall protection the workers safety

  Evaluate the heat transfer introduced by assuming constant

air undergoes a polytropic process in a piston-cylinder assemply from p1 14.7 lbfin2 t1 70 degrees f to p2

  A system changes its state from state 1 to state 2

a system changes its state from state 1 to state 2 following pvconstant.. the pressure p and specific volume v at state

  Air flows steadily at rate of 04kgs through an air

air flows steadily at rate of 0.4kgs through an air compressor entering at 6ms with a pressure of 1 bar and specific

  Assuming the process is working correctly draw and label a

a stream of humid air containing 1.00 mole water vapor and the balance dry air is to be humidified to a water content

  Temperature of refrigerant at end of the heating process

A rigid tank is heated for 9 minutes with a 800W electrical heater. During this time 70kJ of energy is lost due to heat transfer to the environment. Find the temperature of the refrigerant at the end of the heating process.

  The heat engine is to generate 370 kw if the mass flow rate

geothermal steam is planned as an energy source for power generation. the steam enters and adiabatic exchanger at 2

  Determine the resultant normal and frictional forces the

the 150-lb man lies against the cushion for which the coefficient of static friction is mu s 0.5. determine the

  The tunnel is located in boulder colorado altitude 1650 m

an intermittent wind tunnel is designed for a mach number of 4 at the test section. the tunnel operated by sucking air

  Device creates or destroys energy or destroys entropy

The Acme Company claims to have designed an adiabatic turbine that will produce 126.2 BTU per pound of steam. The operating conditions are labeled on the diagram below. Is this company's claim valid or is this a perpetual motion machine? Hint: Determ..

  The r-410a is compressed to 2mpa 60 c in a reversible

a cylinderpiston contains a saturated vapor r-410a at 10 c the volume is 10 l. the r-410a is compressed to 2mpa 60 c in

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd