How long ago did the dumping stop

Assignment Help Civil Engineering
Reference no: EM13211083

Suppose you are a member of an EPA enforcement team investigating the possible dumping of arsenic into Arbor Lake. You take water samples from the middle of the lake and find that the concentration is 90.0 ppb. 10 days later you take another sample and find 82.2 ppb. You furthermore make inquiries at a company on the lake, and an employee confesses to you that they have been dumping 90 g/min for years but that the dumping stopped over 2 weeks ago. If the water in the lake has a residence time of 100 days, the flow rate into the lake is 10 m3/s, the surface area of the lake is 1 x 107 m2, and the rate of evaporation from the lake is 6 cm/wk, how long ago did the dumping stop?

Reference no: EM13211083

Questions Cloud

How much further would the car have skid : The car was travelling on a 3% upgrade on a pavement with friction factor of 0.30. How much further would the car have skid if it did not strike the concrete barrier?
State balanced nuclear reaction for the production : Write a balanced nuclear reaction for the production of dubnium-260 and neutron(s) by bombardment of californium-249 with high-energy
Explain the number of carboxyl group in the molecule : Simplest and most informative way to characterize a carboxylic acid is to determine its neutralization equivalent. The number of carboxyl group in the molecule of the following compound is 1.
What are the concentrations of cl- and br- : AGNO3 is added to a solution containing 0.001 mol Cl- amd 0.001 mol Br- per liter. What are the concentrations of Cl- and Br- remaining when AgCl just begins to precipitate?
How long ago did the dumping stop : the flow rate into the lake is 10 m3/s, the surface area of the lake is 1 x 107 m2, and the rate of evaporation from the lake is 6 cm/wk, how long ago did the dumping stop?
Explain 2-butanol and t-butyl alcohol : Show reasonable function group test to distinguish between the following compounds and write down their characteristic observation. A) 2-butanol and t-butyl alcohol
Compute the maximum acceptable tensile service load : Compute the maximum acceptable tensile service load T that may act on a single angle L6x4x3/4 that is welded along only one leg to a gusset plate; thus, there are no holes. The service load is three times the dead load. Solve for a0 A36 steel.
Determine the stresses in the steel and concrete : determine the stresses in the steel and concrete under the service loads
What is the station of the pt : a horizontal curve on a single-lane highway has its PC at station 124 + 10 and its PI at station 131 + 40. The curve has a superelvation of 0.06 ft/ft and is designed for 70 mi/h. What is the station of the PT?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compose a list here of the geological terms

Was the dam itself of sound design and a product of quality construction?

  What is the astronomic azimuth of the line

The magnetic north azimuth of a line is 128 degrees 27' while the magnetic declination is 3 degrees 30'E. What is the astronomic azimuth of the line (in decimal degrees)?

  Width of the footing if factor of safety given

Characteristic values of the shear strength parameters of the soil are c'= 0, and f' = 400. Determine the required width of the footing if a factor of safety of 3.0 against shear failure is specified when the water table rise to foundation level.

  Determine the angular acceleration of the spool

determine the angular acceleration of the spool and the acceleration of the trailer. The wheels have negligible mass and are free to rotate.

  Maximum and minimum stress intensities in the section

Determine the maximum and minimum stress intensities in the section.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Required to dewater a construction site

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.

  Determine the pressure head at the nozzle inlet to produce

determine the pressure head at the nozzle inlet to produce a water jet velocity of 40 ft/s. Neglect the friction loss and assume incompressible flow.

  At what rate is the string being paid out

a child is flying a kite at a height of 40 ft and the kite is moving horizontally at a rate of 3 ft/sec. if the string is taut, at what rate is the string being paid out when the length of the string is 50 feet.

  What is the rate of evapouration of water

what is the rate of evapouration of water from a reservoir with air temp at 20c and the surface of reservoir is 3000m2.

  Average waiting time in the queue

What is the average length of queue, the average time spent in the system, and the average waiting time in the queue?

  What is the concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd