Reference no: EM131410279
Bremen Engineering
Jurgen Hansmann is the Quality Control Manager of Bremen Engineering. On Tuesday morning he got to work at 7.30 and was immediately summoned by the General Manager. As Jurgen approached, the General Manager threw him a letter that had obviously come in the morning mail. Jurgen saw that the General Manager had circled two sections of the letter in red ink. ‘We have looked at recent figures for the quality of one of the components you supply, AM74021- 74222. As you will recall, we have an agreement that requires 99.5% of delivered units of this product to be within 5% of target output ratings. While your supplies have been achieving this, we are concerned that there has been no apparent improvement in performance over time.' ‘We put considerable emphasis on the quality of our materials, and would like to discuss a joint initiative to raise the quality of your components. By working together we can share ideas and get mutual benefits.' The General Manager waited for a few minutes and said, ‘I find it incredible that we are sending poor quality goods to one of our biggest customers. We have a major complaint about our quality. Complete strangers think that we can't do our job properly, so they'll come and show us how to do it. This is your problem. I suggest you start solving it immediately.' The General Manager's tone made Jurgen rather defensive and his reply was less constructive than normal, ‘There is nothing wrong with our products. We agreed measures for quality and are consistently achieving them. We haven't improved quality because we didn't agree to improve it, and any improvement would increase our costs. We are making 995 units in 1,000 at higher quality than they requested, and the remaining 0.5% are only just below it. To me, this seems a level of quality that almost anyone would be proud of.' The process for making AM74021-74222 has five stages, each of which is followed by an inspection. The units then have a final inspection before being sent to customers. Jurgen now considered more 100% inspections, but each manual inspection costs about €0.60 and the selling price of the unit is only €24.75. There is also the problem that manual inspections are only 80% accurate. Automatic inspections cost €0.30 and are almost completely reliable, but they cannot cover all aspects of quality and at least three inspections have to remain manual. Jurgen produced a weekly summary of figures to show that things were really going well.

For sampling inspections, all production is considered in notional batches of 1 hour's output. Random samples are taken from each batch and if the quality is too low the whole batch is rejected, checked and reworked as necessary.
· A - automatic inspection of all units: rejects all defects
· B - manual inspection of 10% of output: rejects batch if more than 1% of batch is defective
· C - manual inspection of 10% of output: rejects batch if more than 1% of batch is defective
· D - manual inspection of 5% of output: rejects batch if more than 2% of batch is defective
· E - automatic inspection of all units: rejects all defects
· F - manual inspection of 5% of output: rejects batch if more than 1% of batch is defective
Questions
1. Do you think the General Manager's view is reasonable? What about Jurgen Hansmann's reaction?
2. How effective is quality control at Bremen Engineering?
3. Do you think the product quality needs to be improved? How would you set about this?
Low resistivity metal material
: Copper is a low resistivity metal material commonly used for electrical cables and vvires. The resistivity of single crystalline copper bulk material is 1.67X10-6 0 cm. Cu is FCC structure and the lattice constant is 0.361 nm. a. Calculate the fre..
|
Write about any song that was composed in the renaissance
: Write about any song that was composed in the renaissance or in the Middle Ages - The essay must include the name of the song, the composer, melody, harmony, rhymth, texture, dynamics, instrumentation, type and form of the song.
|
Reasons that wind-energy capacity
: 1. What are some of the reasons that wind-energy capacity is growing at 30-40% per year in Europe? At this rate, how long would it take to double this capacity?
|
Why doing well is school is important for the future
: Why doing well is school is important for the future
|
How effective is quality control at bremen engineering
: Do you think the General Manager's view is reasonable? What about Jurgen Hansmann's reaction?
|
How long you expect before revco will emerge from bankruptcy
: What the costs of the Revco bankruptcy will be, and how long you expect before Revco will emerge from bankruptcy. Write your answers in a 850 to 1000-word report and cite your sources.
|
Explain the principles of and barriers
: Explain the principles of and barriers to effective interpersonal communications. Be sure to address the significance of each principle in being an effective communicator. The best papers will list at least two barriers and provide advice for over..
|
What would be a reasonable sampling plan for the component
: The company accept a 5% risk of rejecting good batches, and a 10% risk of accepting bad batches. What would be a reasonable sampling plan for the component?
|
What is the minimum expected cost over three years
: Draw a decision tree for this problem, and find the decisions that minimise the total cost over the next two years. If a three-year-old engine is virtually certain to break down sometime in the next year, what is the minimum expected cost over thr..
|