Reference no: EM132045373
Part A :
For the following general management structure of a manufacturing company, having 4 major operative programs/divisions, and 2 support divisions, as outlined here, with responsible managers in charge of identified sections under each division head, please identify which of the following boxes are Program Managers and which ones can be assigned as Project Managers.
Also, in your judgment, where do you locate the Quality Control team leader's box/office 23? You can use this chart in identifying the roles and locating the box 23.
Part B :
In a car assembly plant, you are in charge of setting up the speed of operation for the line to reduce slack. Each crew/group of technicians at each station is designated to a specific task on the line.
Their allocated time to spend on their tasks for each vehicle is limited and controlled by the Supervisor of the line assembly who controls the speed of the line, you. Remember that the line is moving with a constant speed, and you never "manufacture" anything on this line.
a. The process to make body of a car includes:
o Welding 10 minutes
o Painting & drying 20 minutes
o Doors assembly - 3 minutes
o Windows assembly - 5 min.
o Electrical harness - 4 min
Note: Engines are made in different plant, like many other components, and they are brought to the assembly line to be mounted on the Chassis.
b. Chassis - assembly of all systems and components on the line include:
o Engine assembly - 3 min
o Power train " - 4 min
o Suspensions - 2.5 min
o Brake system - 4 min
o Body assembly on the chassis - 3 min
o Dashboard and wiring connections 2 min
o Interior - total 9 min (upholstery 4 min; carpeting 5 min)
1 - Specify your recommendation on systems installation techniques to optimize the production by reducing Slack or "Wait" time on the assembly line, i.e. identify all systems or components that can be mounted on the chassis using this assembly line.
2 - How can you handle Body manufacturing to match the speed of the assembly line?
3 - What is the "Lowest" & "Highest" speeds (Speed = time allowed to do a specific task at any station) you can recommend for this modified assembly form to yield minimum slack?
What is the amount of cash receipts from customers
: Suppose Columbia Sportswear Company had accounts receivable of $206,024,000 at the beginning of a recent year, and $267,653,000 at year-end.
|
Discuss different concepts presented in the articles
: Discuss at least 3 different concepts presented in the articles. As an IT professional, how would you apply the three (3) concepts you identified.
|
Generate no internal equity for the foreseeable future
: The company will generate no internal equity for the foreseeable future. What is the true initial cost figure Southern should use when evaluating its project.
|
Face an international executive over the next five years
: From an executive's position, identify and explain at least three challenges and opportunities that might face an international executive over the next five
|
How can you handle body manufacturing to match the speed
: How can you handle Body manufacturing to match the speed of the assembly line?
|
What is the view of marx on the city
: What is the view of Marx on the city and how does it differs from the later theories?
|
Evidence in evaluating other points of view
: What is the importance of the credibility of sources and evidence in evaluating other points of view.
|
What is the project equivalent annual cost or eac
: If the required return is 19 percent, what is the project's equivalent annual cost, or EAC?
|
Explain the core values of agile project management
: Essentially, Agile project management means using the best process through empowered teams, customer involvement, and the ability to analyze and quickly.
|