How an electronic circuit can create an electromagnetic wave

Assignment Help Other Engineering
Reference no: EM132207342

Q1 Interference is present in a signal cable between a PLC and a temperature sensor which is running next to a power cable in the tray.

a) List and briefly describe the different types of noise coupling paths possible.
b) List any 2 ways of minimizing the coupling issues?

Q2 The fundamental to an understanding of EMC are the concepts of differential mode, common mode and antenna mode radiated field coupling.

List any 5 differences between differential mode and common mode coupling.

Q3 Describe in at least 4 sentences how an electronic circuit can create an electromagnetic (EM) wave.

Q4 List any 2 primary sources of transients and spikes.

Q5 Describe 2 methods to prevent CM (common mode) to DM (differential mode) conversion in circuits that carry high-frequency signals (such as wideband data or video) or which could be susceptible to RF.

Q6 Explain the difference between EMI and EMC.

Q7 A micro-processor circuit with a clock frequency of 10MHz has been mounted in a metal enclosure. There are, however, some concerns about emissions leaking from the enclosure with the screws screw separation distance x. Close to the micro-processor circuit is a 100MHz receiver circuit which receives noisy signals. The receiver is sensitive at 10 times the clock frequency of the micro-processor circuit and one would have assumed that the 10th harmonic of a square wave would be significantly reduced.

a) You first suspect that (as the other people thought) some RF might be leaking from the lid. You open the lid but the noise at the receiver does not increase a lot. In fact, taking the lid away does not make a big difference. Discuss what might be the problem and if it is possible to emit at 100MHz. Also recommend what the distance x between the screws should be.

b) You are still confronted with a heat problem and need to make holes in the box for forced air cooling. What is the maximum whole size allowable if the people using the receiver inform you that 20dB attenuation should be enough?

c) If the hole size in 5.2 is not adequate for cooling, what can be implemented to increase the hole size without compromising the 20dB attenuation.

Q8 Although lightning and ESD are both pulsed noise, they differ in their treatment and threats. Describe why they are two distinct threats (list at least 3 differences).

Q9 With diagrams/figures explain the relationship between spectrum usage and created interference.

Note - This question is mandatory. It should be answered and students are expected to get this question completely right to be assessed as competent with a score for this module.

Q10 With a diagram describe the representation of EMI.

Q11 Provide answers for the following:
a) What is the difference between Earthing and Grounding in the context of EMC?
b) What is the primary EMC function of a ground system.

Q12 Discuss 3 ways that grounding systems for a circuit reference can be configured.

Q13 The major source of radiation in digital circuits is the processor clock(s) and its harmonics. All the energy in these signals is accumulated at a few specific frequencies, with the result that the clock signal levels are 10 to 20 dB higher than the rest of the digital circuit radiation.

a) Since the commercial radiated emissions standards do not distinguish between narrowband and broadband how can you reduce the narrowband emissions?

b) List the high frequency broadband sources.

c) If circuit constraints allow, list the methods that can be used to slow down clock rates in order to minimize harmonic generation.

d) How can we decrease the level, measured in a constant 120 kHz bandwidth falls, by between 10 to 20 dB without any extra effort made in layouts and without slowing the clock rise times?

Q14 Why is it difficult or almost impossible to shield against magnetic fields at low frequencies (at least 4 points required)?

Q15 Generally, analog circuits are not as susceptible to transient upset as digital ones, but may be more susceptible to demodulation of RF energy. Describe at least 4 points on how to restrict the operating bandwidth to the minimum acceptable level in order to reduce the level of interfering signal.

Q16 List any 3 advantages and 1 disadvantage of surface mount devices (SMDs).

Q17 List and briefly describe the 4 basic types of Surge Protection devices (SPDs).

Q18 List the principles used in PCB shielding.

Q19 Briefly describe any 4 applications for different type of screened cables.

Q20 What are 2 main principles of cable routing?

Q21 List any 2 advantages of using screened connectors.

Q22 List any 3 filter thumb rules for various available conditions for unwanted signals?

Q23 In at least 5 points describe how does the performance of any filter depend on the impedance seen at its terminal?

Q24 Describe any 2 differences between differential and common mode coupling from PCB's.

Q25 Explain in about 4 sentences what the first and foremost step in PCB layout is

Q26 Commercial surge protection identifies three distinct zones with differing surge exposure categories. List and briefly describe these categories

Q27 Describe the principle of using transmission lines on PCB's.

Verified Expert

The solution was provided based on the given questions which are ranging from RF, screened cables, micro processor,other peripherals used in cables.The questions are answered with proper graphical presentations wherever necessary.Mandatory and important questions like 9 & 17 are also done with extra care wherever necessary equations are being provided

Reference no: EM132207342

Questions Cloud

Examples is mostly likely driven by cost efficiency : Which of the following examples is MOSTLY LIKELY driven by cost efficiency?
Identify all the relevant stakeholders to case : Using Disney as the focal organization, identify all the relevant stakeholders to this case.
About firm financial performance : What questions do financial ratios help answer about a firm’s financial performance?
Accountability and transparency : Discuss the need for financial accountability measures in the public sector.?
How an electronic circuit can create an electromagnetic wave : briefly describe the different types of noise coupling paths possible - understanding of EMC are the concepts of differential mode, common mode and antenna
Discuss the implementation plans of company : Discuss the implementation plans of company and the objectives set up by the company 300-500 words? The response must be typed.
Started apprenticeship program for new employees : Brent Pipes, the owner of Brent Pipes Plumbing, started an apprenticeship program for new employees.
What will the beta of the equity in the firm : If the tax rate is 40%, what will the beta of the equity in the firm be after the leverage buyout
Prepare a clear definition of the objectives of the project : Prepare a clear definition of the objectives of the project and, where practical, this should be related to the current strategies of the organisation

Reviews

Write a Review

Other Engineering Questions & Answers

  Determine the transfer function of the uncompensated system

ECE 382 Homework. Determine the transfer function of the uncompensated system and use MATLAB to obtain its root locus

  The angle the line makes with the x-axis

After reviewing the materials of this week, please answer the following question. Is there a relationship between the sign (positive or negative) of the slope of a line and the angle the line makes with the x-axis?

  Milestone two guidelines and rubric overview

Business law impacts our everyday lives, both personally and professionally. Businesses enter contracts, manufacture goods, s ell services and products, and engage in employment and labor practices - activities that must all adhere to certain laws..

  What can be done to ensure proper synchronization

Consider a bus topology in which two processors communicate through a buffer in shared memory. When one processor wishes to communicate with the other.

  Provide a detailed management plan for this operation

MRE80002 Dredging Engineering 2016 Assignment. Your task is to provide a detailed management plan for this operation. The plan should include, but not necessarily be limited to, Project background & Objectives, Project safety, Environmental issues ..

  Demonstrate that an angle ply laminate

Demonstrate that an angle-ply laminate has A16 = A26 = 0 using an example laminate of your choice. In which case D16 = 0? In which case D16≠ 0?

  The implementation of an integrated is solution

Design a risk matrix to show the likelihood and the impacts of the risks of the failures of the critical IS What is the role of Business Process Re-engineering in the implementation of an integrated IS solution

  Compute approximate values for the composite

ompare the results obtained using the mechanics of materials approach with the results obtained using more accurate formulas which are programmed in the accompanying software.

  Create an up-down counter that is able to increment display

Create an up/down counter that is able to increment the display going from 0 to f (or f to 0) and then back around every clock cycle.

  Draw the per-unit sequence networks

Three identical transformers, as described, are connected with their primaries in Y (solidly grounded neutral) and with their secondaries and tertiaries in Δ. Draw the per-unit sequence networks of this transformer bank.

  Design an initial conceptual model dynamic designs

Design an Initial conceptual model Dynamic designs, Initial conceptual model A full class diagram with a complete set of labelled associations, compositions and generalisation where appropriate. All associations should indicate correct multiplicities..

  Construct a truth table and find minimized boolean function

Construct a truth table and find the minimized Boolean function to implement the logic telling the director when to hire. Draw a circuit diagram for the Boolean function using any Logic Design Simulator (provide only a screenshot)

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd