You have been hired to lead a project (the project of your choice). As the project manager, you know it is important to get the project off to a good start. Using the tools provided in the required readings, provide a quick summary of your project, including the scope and objectives of your project. Be sure to include a high-level WBS for your project.

Example below:

PROJECT OBJECTIVE

To construct a high-quality, custom home within five months at cost not to exceed $500,000.

DELIVERABLES

    A 2,200-square-foot, 2½-bath, 3-bedroom, finished home.

    A finished garage, insulated and sheetrocked.

    Kitchen appliances to include range, oven, microwave, and dishwasher.

    High-efficiency gas furnace with programmable thermostat.

MILESTONES

    Permits approved—March 5

    Foundation poured—March 14

    Drywall in. Framing, sheathing, plumbing, electrical, and mechanical inspections passed—May 25

    Final inspection—June 7

TECHNICAL REQUIREMENTS

    Home must meet local building codes.

    All windows and doors must pass NFRC class 40 energy ratings.

    Exterior wall insulation must meet an “R” factor of 21.

    Ceiling insulation must meet an “R” factor of 38.

    Floor insulation must meet an “R” factor of 25.

    Garage will accommodate two large-size cars and one 20-foot Winnebago.

    Structure must pass seismic stability codes.

LIMITS AND EXCLUSIONS

    The home will be built to the specifications and design of the original blueprints provided by the customer.

    Owner is responsible for landscaping.

    Refrigerator is not included among kitchen appliances.

    Air conditioning is not included but prewiring is included.

    Contractor reserves the right to contract out services.

    Contractor is responsible for subcontracted work.

    Site work limited to Monday through Friday, 8:00 A.M. to 6:00 P.M.

Reference no: EM131275698

Questions Cloud

Developing competitive advantages : Describe ways that Apple can match its strengths to its opportunities to create capabilities in serving customers' needs. Are these capabilities and competitive advantages grounded in the basic principles of operational excellence, product leadership..
Loan processing operation that processes an average : Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 4 loans per day. The operation has a design capacity of 18 loans per day and an effective capacity of 16 loans per ..
Strategic management decision-making : Ryanair based in Dublin, Ireland, has been renowned in Europe as a firm that can make a profit on a $20 ticket by imposing numerous fees and surcharges. The airline has sought to be the lowest of low-cost provider in the EU with a " no frills get you..
What will the average total cost be to complete third order : Atkinson Research Association (ARA) had received a contract to produce five units of new cruise missile guidance control. The first unit took 9000 hours to complete and cost $425000 in materials and equipment usage. What will the total cost to build ..
Hired to lead a project : You have been hired to lead a project (the project of your choice). As the project manager, you know it is important to get the project off to a good start. Using the tools provided in the required readings, provide a quick summary of your project, i..
Employers exclude older employees from safety-sensitive jobs : May employers exclude older employees from safety-sensitive jobs based on assumptions about health status? Explain. Non-medical tests used for making employment selection decisions must be scored in some way. Discuss the various legal and illegal met..
What methodologies and metrics : You are evaluating a relocation project for a manufacturing company that is deciding if it will move operations another U.S. state, Mexico, or Canada. What risks need to be considered and will factor into your decision? What methodologies and metrics..
Labor cost for level capacity aggregate planning strategy : A small manufacturing plant is considering their aggregate plan for the next fiscal year. They are limited to a maximum number of 32 FTEs each quarter. For next fiscal year, find their annual regular time direct labor cost and overtime direct labor c..
Discuss and summarize the affordable care act : Discuss and summarize the Affordable Care Act of 2010 (ACA) by including mention of all these terms:

Reviews

Write a Review

Operation Management Questions & Answers

  Find the optimal inventory policy

For an inventory item, suppose the demand is 1200/month, lead time is 0.52 weeks, and safety stock is 5. The item cost is $16, the unit ordering cost is $40/order, and the unit carrying cost is $0.80/item/quarter. Find the optimal inventory policy th..

  Labor hours should the seventh tablet prototype require

The ABC Company is planning to produce seven tablet prototypes that will blow arch-rival Appintosh, Inc. out of its mind. The tablet prototypes will all be produced in a very similar fashion, so they anticipate that learning curves should be consider..

  Design an aggregate production plan

Sawyer Furniture is one of the few remaining domestic manufacturers of wood furniture. In the current competitive environment, cost containment is the key to its continued survival. Demand for furniture follows a seasonal demand pattern with increase..

  Labor concerning elimination of employee rest breaks

Alice Jones was employed as a clerk-typist by a company. She requested and was refused a vacation day. The employer’s refusal was based on her failure to submit the request at least two weeks in advance as required by company policy. Jones claimed th..

  Concept of maintenance and maintenance procedures

Why must the logistics manager understand the concept of maintenance, maintenance procedures, and the types of maintenance?

  Write a proposal regarding fedex

Write a proposal regarding FedEx. The proposal should include the following items: Clear statement of the strategic issue that has been chosen Why the topic was chosen The proposed plan of study

  Estimate the maximum fixed cost

Zipco is in serious negotiations to purchase a chunking machine that will enable them to perform their own chunking at $1.25 per unit. They currently have their chunking outsourced at a cost of $1.75 per unit and a fixed cost of $50,000.

  Calculate a new mrp that improves the base mrp

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly ..

  Evaluate the risks to plastic dollars of programmed threats

Amanda and Chris McDermott own a small business, Plastic Dollars, which produces and maintains stored value cards for retailers. Most of the cards they sell are gift cards, such as those available in various restaurants and stores.

  Demonstrate the cyclical time series pattern

Describe a situation or set of data that would demonstrate the cyclical time series pattern. Explain what characteristics the data possess.

  Average weekly hours per worker in explaining variation

The role of average weekly hours per worker in explaining variation in total hours worked per year is about as important as employment in determining total hours. The role of average yearly hours per worker in explaining variation in total hours work..

  Training to Correct a CSR Interaction

Based on a negative customer service experience of your own or someone you know you will examine the steps necessary in the process to train CSRs to improve the customer experience that you initially practiced in the Learning Activity. Use a negative..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd