A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long. There are 15 access points along this grade. The peak- hour traffic volume has 2500 passenger cars and 200 trucks and buses ( no recreational vehicles), and 720 of these vehicles arrive in the most congested 15- min period. This traffic stream is primarily commuters. The measured free- flow speed is 55 mi/ h. To improve the level of service, the local transportation agency is considering reducing the number of access points by blocking some driveways and rerouting their traffic. How many of the 15 access points must be blocked to achieve LOS C?
Processing begins when the lane reaches capacity, what is the uniform deterministic arrival rate if the vehicle queue is cleared in 35 minutes after vehicles begin to arrive (in veh/min.)?
Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways:
A four-lane urban freeway (two lanes in each direction) is located on rolling terrain and has 12-ft lanes, no lateral obstructions within 6 ft of the pavement edges, and an interchange every 2 miles.
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
A falling-head permeability test was carried out on a clay soil of diameter 100 mm and length 150 mm. In 4 minutes the head in the standpipe of diameter 5mm dropped from 680 to 350 mm.
a) What flow rate (m 3/s) does the filter handle during production? b) What volume of water is needed for backwashing plus rising the filter in each filter cycle?
What additional data and information should he gather,and how should he go about gathering the data information ?
You fill a 2-cubic foot wheelbarrow to the top with aggregate. if the specific gravity of the aggregate is 2.548 and 18% of the aggregate is void spaces, how much does the aggregate in the wheelbarrow weight?
Critical review the decision making of a failed major construction/property project within the UK in the last ten years.
The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd