Consider the aggregate planning problem discussed in Example 2.13 (Section 2.15). Discuss how the LP formulation will change if the following constraints are added.
(a) Union regulation requires that no more than 10% of the workforce can be laid off in any month.
(b) The personnel department estimates that no more than 50 trainees can be hired in any month.
(c) The company wants to limit the change in workforce from 1 month to the next to 10 workers.
(d) Company's warehouse limits the monthly inventory to 120 units.
Example 2.13
A parts supplier has a contract with an OEM to supply 1550 units of some component C for the next 6 months. Table 2.10 gives the OEM's monthly requirements during the contract period. The supplier has 20 workers and 50 units of C on hand now. Each worker can produce 10 units of C per month. The company can recruit from the local labor market, but the recruits have to be trained for 1 month by a worker before they can be used in production. Each worker can train at most five recruits during a month. A worker is paid $3000 per month, when used in production or training. A worker can be laid off at a cost of $2000 per month. Firing a worker costs $5000. Each recruit is paid $1500 during training. Production ahead of schedule incurs an inventory holding cost of $50 per unit per month. Each unit of C not delivered on schedule involves a penalty cost of $75 per month until delivery is completed. However, all deliveries must be completed in 6 months. The supplier requires a final labor force of 30 workers and 50 units of C at the end of the 6th month. The aggregate planning problem is to decide what hiring, firing, producing, storing, and shortage policy the supplier should follow in order to minimize the total costs during the contract period. Formulate this problem as an LP model and solve. Discuss the production plan.
what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.
Develop a simple urban constructed wetland design.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
Determine the corresponding error in the computed discharge
Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel
Write a paper on steel sustainability.
Writing case study about bridge collapse
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd