Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A metropolitan area lies along the two banks of a river - or the two shores of a bay as in the SF Bay Area. This body of water is W km wide and L km long. Studies show that F cars will travel across the water each day if bridges with enough capacity are constructed to carry the traffic. We estimate that the daily interest society must pay on the bonds issued to pay for a bridge with a capacity to carry f cars per day is C = (a + bf)W dollars per day. We also assume that the origins and destinations of the F trips are uniformly and independently distributed along the two shores and that everyone uses the bridge that involves the shortest detour. These detours cost commuters . dollars per vehicle-km, including time wasted and out of pocket expenses. Let n be the number of bridges constructed between the two shores (and note that bridges cannot be constructed at the northern or southern edge of the metropolitan area).
Assume that the n bridges are equidistant, that a trip requires a detour if its origin and destination are between the same two consecutive bridges or between a bridge and the northern or southern edge of the metropolitan area, and that the average length of a detour is 1/3 of the separation between bridges, L/(n+1).
Write a formula for the number of bridges that minimizes the sum of the construction and detour costs. (This is not necessarily the solution that society would choose based on the political process, but it should be a rough approximation.)
what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.
Develop a simple urban constructed wetland design.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
Determine the corresponding error in the computed discharge
Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel
Write a paper on steel sustainability.
Writing case study about bridge collapse
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd