Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A race car C is being tracked via telemetry. The on-board acclerometer records and acceleration level of -.7get+.5gen. If you know that the v at this instant is 200km/hr, what is the tracks radius of curvature at this instant?
Water, initially dry saturated vapour at 4 bar, lls a closed rigid con- tainer. The water is heated until its temperature is 400C. Determine the work done and the heat transfer.
For a flow of 2 MGD, an influent BOD of 200 mg/l, a depth of 8 feet, and a desired effluent BOD concentration of 20 mg/l, determine the volume required for trickling filtration treatment as predicted for single-stage treatment by using NRC equatio..
A w14X74 of A992 Steel has a length of 20 feet and fixed ends. Compute the design compressive strength for LRFD and the allowable compressive strength for ASD.
A six bladed rushton turbine 2.0m in diameter rotating at 25 rev/min in a tank 4m deep, water temperature= 10 degree celcius. For this flocculation system calculate the following: a) Reynolds number
A square yellow-brass bar must not stretch more than 2.5 mm when it is subjected to a tensile load. Knowing that E = 1.5 GPa and that the allowable tensile strength is 150 MPa
Wastewater from a paper mill contains ultimate BOD of 200ppm and DO of 3ppm, water is discharged at a rate of 100,000 gallons per day into a river, the river has a flow of 1 million gallons per day with no BOD
disk of radius R=7 in. spins at a constant angular speed of w=500rpm in the clockwise direction. If the disk is released from rest far above the ground, what are the speed and acceleration of the disk's top C point after it has fallen h=3ft
A MH at an intersection has an inflow from three 8-inch PVC (n = 0.01) sanitary sewer pipes laid at minimum slope converging at an intersection and one pipe taking the flow from those three further downstream.
Three completely mixed stabilization ponds are connected in series, and the system removes 99.998% from the total coliform count of the influent to the first pond. In stabilization ponds, coliform bacteria are removed by a first-order process
The undeformed length of the spring is l. Knowing that the collar is released from rest at x = and neglecting friction between the collar and the horizontal rod, determine the magnitude of the velocity of the collar as it passes through point C.
The design parameters are: • Q = 65 m3/d, • Wetland area (A) = 0.23 hectares (2,300 m2) (including the safety factor), • Aspect ratio = 8:1 • Average water depth (d) = 0.5 m • Bed slope = 1% (0.01 m/m) Given that the Manning's resistance factor
A flood control project has a construction cost during the first year of $10 million, during the second year $6 million, and during the third year $2 million. It is completed at the end of the third year and thereafter incurs an annual operating c..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd