Given: The elevation of the end shearwall of a building as shown in Fig. 3.C. The force from the roof diaphragm to the shearwall is 10 k. The wall dead load D = 20 psf, and the seismic coefficient is 0.200.
Find: The total shear and the unit shear at the midheight of the wall adjusted to an ASD level
We are analysing energy efficiency of four different cars, A (3.2 miles/kwh), B (42 mpg using Clean Diesel), C (22 mpg using corn based ethanol E85), and D (28 mpg using regular gasoline). Now accounting for all of the energy used, including extra..
A tension specimen has a gauge length of 8 inches and a diameter of .505 inches. A load of 9580 pounds was found to develope a stress in the specimen equal to the proportional limit of materials. ( assume that the proportional limit and the yield ..
Given an aluminum simply supported beam with overhang, determine the applied load at the free end with a max deflection of 1". b= 1" h= 0.25" L=12" l= 24" E= 10,000 ksi
A 15kg Block rests on top of a 25kg Block which is subject to a 400N force. Block B sits on a table. the Coeffiecents of friction are the same for all surfaces, u(s) is .4 and U(k) is .3. The force is Applied to the bottom block ( with no inclinat..
Tabulate station elevations for a 200-ft equal-tangent parabolic curve with g1= -1.25%, g2= +1.25%, VPI station = 146+00, and VPI elevation = 1,895.00 ft. Compute values if stakeout is at 30-ft increments. Check by second differences
A trapezoidal channel has a bottom width of 5 feet, a slideslope (horizontal:vertical) of 2, and a depth of flow of 4 feet. The elevation of the channel bottom drops 2 feet every 1000 feet of horizontal distance traveled.
A pump is to be used to draw seawater from the bay at an elevation of 0 to a reservoir at a desalination plant that has a water surface elevation of 255 feet. A 12-inch diameter DIP pipe (CHW = 120) which is 625 feet long connects the two bodies ..
Under these conditions flow is expected to be turbulent, but for a clean air, very smooth enterance (with guided vanes) to the tube and no tube vibration, it may be possible to maintain laminar flow.
A rubber ball is inflated to a pressure of 65 kPa .At that pressure the diameter of the ball is 240mm and the wall thickness is 1.25 mm.The rubber has a modulus of elasticity E of 3.6 Mpa and a poisoon'd ratio of 0.48.
The drive is expected to operate at least six times per hour for three shifts per day, seven days per week, for at least 15 years.
The steel uniform shaft has four pulleys attached to it and frictionless bearings at its ends. The pulley at B is connected to a motor that is driving the system. The other three pulleys are consuming the power delivered by Pb .
Working a problem where there are two one-story buildings of different heights next to each other. Earthquake imparts a base motion z(t) that is a cosine function. I'm given a shape function for a column of height L when deriving the EOM for each ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd