A rocket is launched vertically. At time t = 0, the rocket's engine shuts down. At that time, the rocket has reached an altitude of 500 m and is rising at a velocity of 125 m/s. Gravity then takes over. The height of the rocket as a function of time is
h(t) = -9.8/2(t2) + 125t + 500 for t>0
(a) Create a function called height that accepts time as an input and returns the height of the rocket. Use your function in your solutions toparts b and c.
(b) Plot height versus time for times from 0 to 30 seconds. Use an increment of 0.5 second in your time vector.
(c) Find the time when the rocket starts to fall back to the ground. (The max function will be helpful in this exercise.)
Aerotron Electronics is considering purchasing a water filtration system to assist in circuit board manufacturing. The system costs $40,000. It has an expected life of 7 years at which time its salvage value will be $7,500.
If the load effect has a mean value of 88 kips and a standard deviation of 1.8 kips. If the nominal material strength is 160 kips Determine the followings 1- The probability of failure of the structure under the nominal resistance and service load..
The bund channel is to be formed by the embankment only. The horizontal distance between two bund s is 50 m. The 1-hr rainfall expected during the recurrence interval of 10 yrs is 8 cm/hr.
Carlisle Company has been cited and must invest in equipment to reduce stack emissions or face EPA fines of $18,500 per year. An emission reduction filter will cost $75,000 and have an expected life of 5 years. Carlisles MARR is 10 percent/year.
A horizontal prestressing force of 500kN is applied to a rectangular beam. The beam has a depth of 450mm and a width of 250mm. The force is applied at a distance of 60mm below the sections x-x axis.
A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state
The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.
Wheeling-Pittsburg steel is investigating whether it should replace some of its basic oxygen furnace equipment now or wait to do it later. The cost later (3 years from now) is estimated to be 1,700,000.
North City must choose between two new snow-removal machines. The SuperBlower has a $70,000 first cost, a 20 year life, and an $8000 salvage value. At the end of 9 years , it will need a major overhaul costing $19,000.
A 24-in.-wide by 0.100-in.-thick by 140-in.-long steel sheet is to be formed into a hollow section by being bent through 360° and having the long edges welded (i.e., butt-welded) together. Assume a cross-sectional medial length of 24 in.
A particular crest vertical curve has long been criticized as being unsafe. Its length is 400 ft. The prevailing speed on the crest vertical curve is 50 mph. In its present condition, its tangent grades are +2% and -3%.
Saturated liquid water at 1000 kPa flows at 2 kg/s inside a 10 cm outer diameter steel pipe and outside of the pipe is a flow of hot gases at 1000 K with a convection coefficient of h = 150 W/m2 K
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd