Find the speed of the suitcase at the end of the path

Assignment Help Civil Engineering
Reference no: EM13557094

1.The velocity of the 170 g hockey puck is m/s. Assume that 200 g is the equivalent mass of the stick concentrated in the blade which contacts the puck. The coefficient of restitution of between puck and blade is 0.6. Find the velocity of the blade of the stick, vs to send the puck to the goal.

2.A woman is pulling a suitcase by exerting a force 40N at an angle of 20 degrees above the horizontal. The suitcase has a mass of 15kg, and a constant friction of 15N opposes the motion. She starts with an initial speed of 0 and moves the suitcase a distance of 20m. Find the speed of the suitcase at the end of the path.

Reference no: EM13557094

Questions Cloud

Determine the gauge pressure head and the absolute pressure : A vertical tank of 4.sm2 cross-sectional area is filled with 13.5m3 of water, 9.0m3 0f a fluid with an s.G. of 3.2,6.75;. or oir with an s.G. of 0.85 and 0.9m3 of mercury with an s.G. of 13.s7.
How many drums are required if the project is to be complete : If 140,000 cy of compacted fill are required using the type of compaction drums described, how many drums are required if the project is to be completed in 25 working days?
What is the penetration h for the pile : A pile resists the tension developed by three stay cables for a major for a tent (membrane) structure. Assuming no bending is desired in the pile (no resultant horizontal componenet), what is the magnitude of the force S if the and (theta sub S)
What is the greatest vertical height ball achieves : A ball is thrown with a valocity of 30 m/s at an angle of 40 degrees above the horizontal from the top of a 100m tall building. a) what is the greatest vertical height ball achieves? b) what is balls velocity when it lands. (neglect air resistance in..
Find the speed of the suitcase at the end of the path : The velocity of the 170 g hockey puck is m/s. Assume that 200 g is the equivalent mass of the stick concentrated in the blade which contacts the puck. The coefficient of restitution of between puck and blade is 0.6. Find the velocity of the blade of ..
What was the velocity of a just before impact : Suppose you are to investigate an accident in which a 1300 kg car A struck a parked 1200 kg car B. All four of B’s wheels were locked and skid marks indicate that B slid 2 m after impact.
What is the reliability of the system : A water pipeline system is made up of three links in parallel. In any given year, on average, 99 in 100 pumps do not fail. The conditions in the links are statistically independent of each other.
Figure out that the service time could be assumed : The chief engineer of an airport is planning to rehabilitate runway pavements over the next several months. You ask him what impact this would have on delays and queues, but he does not know
Determine the force p in the coupling between the trailer an : The hydraulic braking system for the truck and trailer is set to produce equal braking forces for the two units. If the brakes are applied uniformly for 5 sec to bring the rig to a stop from a speed of 20 mph while moving down a 10 percent grade

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the adequacy of the design using basic principles

For the eccentric shear loading of the accompanying figure, 7/8 inch diameter A325 bolts are used in two vertical lines in a bearing-type (A325-X) connection. The loading is 10 kips dead load and 30 kips live load.

  Which the original 13 colonies were surveyed

Fixed GPS broadcast stations enable users to make differential measurements to other points whose positions are needed. In the US, there are two such networks two such networks of broadcast stations, name one (blank)

  Calculate specific internal energy of water leaving valve

Water is at 9000 kPa and 300 degrees celcius and flows through a partially open valve. Pressure immediately after the valve is measured to be 600 kPa. Calculate the specific internal energy of the water leaving the valve

  How much settlement has occurred when the time factor is

If the final consolidation settlement is expected to be 1.0m, how much settlement has occurred when the time factor is 0.2 andwhen it is 0.7?

  Write a loop that will estimate the value of the moody f

Use input values of epsilon (B1), pipe radius (B2), and Reynolds number (B3) to estimate "f" and place these in the same cells . Display the final answer in a message box and round to five figures. Use a short cut key of Ctrl+g

  What is concentration in kilograms of carbon per cubic meter

he concentration of carbon in an iron-carbon alloy is 0.15 wt%. What is the concentration in kilograms of carbon per cubic meter of alloy

  What is the max flowrate which will occur without cavitation

If the water temperature is 70 degrees C (vapor pressure of water at 70 degrees C is 31.2 kPa absolute), and the pressure in the pipeline is 275 kPa, what is the maximum flowrate which will occur without cavitation

  Find the moment equations and then the deflection

a simple beam with a pin support at A on the left side of my beam, and a roller connection 20 feet away on the far right side of the beam labeled C, with the midspan point (10 feet) labeled B.

  The velocity with which they describe their orbit

Communication satellites are placed in a geosynchronous orbit i.e in a circular orbit such that they complete one full revolution about the earth in one sideral day (23.934h), and thus appear stationary with respect to the ground.

  What is left turn adjustment factor for the case described

An intersection approach has three lanes, permitted left turns, and 6% left-turning volume with a through vehicle equivalent of 5.0 tvu/left turn. The saturation flow rate for through vehicles under prevailing conditions is 1,700 veh/hg/ln.

  Find volume of the aeration basin in gallons to meet ratio

A wastewater treatment plant has a flow of 30 mgd. The influent BOD is 250 mg/L. Assume that 30% of the BOD is removed in the primary clarifiers. The plant is designed to carry 3,000 mg/L of VSS in the aeration basin.

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd