Find the specific flow exergy into and out of the steam

Assignment Help Civil Engineering
Reference no: EM131233675

Find the specific flow exergy into and out of the steam turbine in Example 7.1, assuming an ambient at 293 K. Use the exergy balance equation to find the reversible specific work. Does this calculation of specific work depend on T0?

Example 7.1

Steam enters a steam turbine at a pressure of 1 MPa, a temperature of 300?C, and a velocity of 50 m/s. The steam leaves the turbine at a pressure of 150 kPa and a velocity of 200 m/s. Determine the work per kilogram of steam flowing through the turbine, assuming the process to be reversible and adiabatic.

Reference no: EM131233675

Questions Cloud

Find all the fluxes of exergy in the refrigerator : The refrigerator in a kitchen shown in Fig. 5.7 receives electrical input power of 150 W to drive the system, and it rejects 400 W to the kitchen air. Find the rate of energy taken out of the cold space and the COP of the refrigerator.
State what you expect to be the results of the lab procedure : A hypothesis is an educated guess. Based on what you have learned and written about in the Introduction, state what you expect to be the results of the lab procedures.
As federal administrations change-requirements change : OSHA imposes obligations on the employer, but these obligations are not limitless. As federal administrations change, requirements change. Let's start by focusing on ergonomics. A major concern of OSHA throughout the 1990s was worker maladies such as..
Determine the quantities of materials required per cubic : Determine the quantities of materials required per cubic yard to create a concrete mix. - A maximum water-cement ratio of 0.63. Assume 5% air voids.
Find the specific flow exergy into and out of the steam : Find the specific flow exergy into and out of the steam turbine in Example 7.1, assuming an ambient at 293 K. Use the exergy balance equation to find the reversible specific work. Does this calculation of specific work depend on T0?
Determine total number of tons each of sand required : It is estimated that 8% of the sand and 6% of the gravel will be lost or not recovered in the stockpile at the job.-  Determine the total number of tons each of sand and gravel required for the project.
Write a short summary about concepts in the lab : This is an investigation of what is currently known about the question being asked. Use background information from credible references to write a short summary about concepts in the lab.
How will this project improve business supply chain : When deciding multiple projects, how will this project improve a business supply chain? This will potentially reduce the labor force by one third (about 100 people) and will potentially result in the sale or disposition of approximately $3 million wo..
Valuable for a non-mathematician : Discuss why it might be valuable for a non-mathematician, non-engineer to have an appreciation and/or a working understanding of higher level mathematics, even if the computations will not be part of their daily routine. Min of 100-150 words

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the magnitude of the resultant force

Determine the magnitude of the resultant force and its direction, measured counterclockwise from the positive x axis.

  Determine the degree of saturation-void ratio and porosity

After drying in the oven, it weighs 4.44 kg. The relative density of the grains is 2.70. Determine the degree of saturation, void ratio, porosity and moisture content of the soil in its natural state.

  Provide a qualitative evluation of the site as a basis

An industrial intermediate, 2, 4-dimethylphenol, has been spread on a surface soil as a 500-mg/L solution. the weekly volume placed on the soil was 25% of the pore volume for the top 0.5m of soil.

  Determine the velocity at which he lands on the ground

Due to atmosphere drag, the deceleration equation is 60a=588.6-30v^2 in m/s^2. Find the velocity at which he lands on the ground. This velocity is referred to as terminal velocity, which is found by letting the distance of the fall (y) go to infin..

  Find the safety factor of the wire against breaking

A closed tank is filled with a liquid. The pressure at the top of the tank is less than atmospheric pressure. Which of the following accurately represents the gage pressure distribution on the surface indicated?

  Determine what is the speed at touchdown

if the aircraft is encountering a steady side wind of speed vw=10 mi/hr , at what angle (a) should the pilot direct the aircraft so that the absolute velocity is parallel to the runway

  Determine the clearance between the tube and the cylinder

a 25-mm diameter steel cylinder 300-mm long falls, because of its own weight, at a uniform rate of 0.1 m/s inside a tube of slightly larger diameter. A castor-oil film of constant thickness is between the cylinder and the tube.

  Does construction method have any play in the construction

Battered piles are used on many construction projects as a permanent part of the element being constructed. Does this construction method have any play in the construction of a temporary earth retention system

  Sketch the specific energy diagram and indicate

Water in a rectangular channel flows into a gradual contraction section. If the flowrate is Q = 25 ft^3/s and the upstream depth is 2 ft, determine the downstream depth. Sketch the specific energy diagram and indicate its important characteristics. N..

  Determine the quantity of sand required

The sand in its loosest state has a porosity of 90% and the desired porosity, when compacted, is 20%. Assuming the average thickness of the completed island is 100 m, determine the quantity of sand required.

  What range of reactor volumes is necessary to achieve time

to achive a specific level of disinfection a water treatment plant operator determines the" Ct" value 180mg min/l is necessary with units for disinfectant concentration C in mg/l and disinfectant contact time t in minutes

  How many units must the company sell each year to breakeven

the cost and revenue associated with producing a sustainable component are fixed costs = $112,500. Variable costs = $30 / unit. Revenue = $45 / unit. How many units must the company sell each year to breakeven

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd