Find the point at which the line with parametric equation

Assignment Help Civil Engineering
Reference no: EM13547873

1.Find the point at which the line with parametric equation x=2+3t, y=-4t, z=5+t intersects the plane 4x+5y-2z=18

2.One of your crews measured the earth pressure for a new dam construction site, and it looked like the measured earth pressure is much lower than the expected value. What do you think the problem could be? How are you going to corrrect the situation?

3.An engine cooling system initially contains 16 quarts of a mixture of water and antifreeze, which is 30 % antifreeze on a volume basis. if its desire to be removed and replaced with pure (100%) antifreeze?

Reference no: EM13547873

Questions Cloud

Demand and supply of money : Demand and supply of money
Calculate the net present value of his migration : a. Calculate the net present value of his migration.
What is the mass of the meter stick : A meter stick balances at the 50.0 cm mark. If a mass of 50.0 g is placed at the 90.0-cm mark, the stick balances at the 61.3 cm mark. What is the mass of the meter stick?
Calculate the monopolist profit : Calculate the monopolist's profit.
Find the point at which the line with parametric equation : An engine cooling system initially contains 16 quarts of a mixture of water and antifreeze, which is 30 % antifreeze on a volume basis. if its desire to be removed and replaced with pure (100%) antifreeze?
Find out the density of a 5 gram sample of gasonline : Describe the technique you would use to deteremine the density of a 5 gram sample of gasonline or granular sugar at 20 degrees celcius and 1 atmosphere pressure
Yen appreciated relative to the dollar even though : In the mid-to-late 1970's, the yen appreciated relative to the dollar even though Japan's inflation rate was higher than America's.
Maintain the par value of an under-valued exchange rate : In a diagram, show how the central bank maintain the par value of an under-valued exchange rate in a fixed exchange rate currency regime. Provide a short explanation.
An increase in the expected future exchange rate : What factors can cause an increase in the expected future exchange rate?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the magnitude of the couple which is applied

Three shafts and four gears are used to form a geartrain which will transmit 7.5 kW from the motor at A to a machine tool at F. (Bear- ings for the shafts are omitted from the sketch.) Knowing that the frequency of the motor is 30 Hz

  Determine for each case the ration of the total energy

(1) a constant wind velocity that is twice the mean wind velocity and operating half the time; and (2) a constant wind velocity that is three times the mean wind velocity operating one-third of the time.

  Determine what power must be supplied by the pump

The length of the pipeline in the building is 60 m, the water temperature is 20.C, and the water pressure on the top floor must be at least 150 kPa. Will a booster pump be required for the building If so, what power must be supplied by the pump

  Is it right for johnson to omit reference to the data

Thirty six year old Johnson was in his last semester of his graduate program in Civil engineering. Father of two small children, he was anxious to get his degree so that he could spend more time with his family.

  Determine the distance the orbiter travels from the time t

A 230,000-lb space shuttle orbiter touches down at about 220 miles per hour (mph). At 200 mph, its drag parachute is deploys. The wheel brakes are applied at 100 mph until wheel sotp and the drag parachute is jettisoned from the orbiter at 35 mph.

  Find an equation of a plane containing the three points

Find an equation of a plane containing the three points (-2, 5, -3), (-7, 3, 1), (-7, 4, 3) in which the coefficient of x is -8.

  Calculate its book value using straight-line depreciation

An asset costs $14 000 and has a scrap value of $3000 after sevenyears. Calculate its book value using straight-line depreciation

  Determine the velocity of the contact point in contact

Pinion gear A rolls on the fixed gear rack B with an angular velocity = 8 rad/s. Determine the velocity of the gear rack c . Assume the direction to the right as positive.

  What is the magnitude and direction of the resultant force

Water under a gage pressure of 65 psi flows with a velocity of 12.5fps through a right-angled bend that has a uniform diameter of10in. The bend lies in a horizontal plane

  Calculate and plot the distribution of total and effective

Calculate and plot the distribution of total and effective vertical stresses as well as pore-water pressure with depth from the ground surface up to the bedrock surface.

  How to calculate the minimum length of the curve

The minimum clearance between the roadway and the waterline must be 6 feet. The PVI is located at station 19+00.00 with elevation 420.50 feet. The design speed of the curve is 55 mph, g1 is +3%, and g2 is -3.0%. PRT= 2.5 sec, 0.35 = friction facto..

  What torque is required to drive the disk at 760 rpm

A flat disk spins within an oil-filled enclosure. Clearances between the enclosure to both sides of the disk is 2.3 mm. The disk surface (area subject to shear) extends from radius 10mm to 90 mm.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd