Find the final volume and temperature for both cases

Assignment Help Civil Engineering
Reference no: EM131233330

A handheld pump for a bicycle (Fig. P6.91) has a volume of 25 cm3 when fully extended. You now press the plunger (piston) in while holding your thumb over the exit hole so that an air pressure of 300 kPa is obtained. The outside atmosphere is at P0, T0. Consider two cases: (1) it is done quickly (∼1 s), and (2) it is done very slowly (∼1 h).

a. State the assumptions about the process for each case.

b. Find the final volume and temperature for both cases.

2063_a8cd98c0-28ac-4d3e-abd8-9a68fe186f85.png

Reference no: EM131233330

Questions Cloud

What is the enterprise value of midland : What is the value of the Debt and Equity on their balance sheet for capital structure (exhibits 1 & 2)? What is the Enterprise Value (EV) of Midland? What is Midland's Kd (Cost of Debt)
Analyse and articulate business processes : ACCT6001 Accounting Information Systems - Analyse and articulate business processes and recognise the role of accounting information systems in enhancing business process design.
Small computer program that is typically installed : Malware is defined as a small computer program that is typically installed without the knowledge of the end user. It is designed to spy, annoy, or cause other harms to the user.
Difference between economic strike and ULP strike in term : What is the difference between an economic strike and a ULP strike in terms of the rights and obligations of the employer? Why are these distinctions important for the employer?
Find the final volume and temperature for both cases : A handheld pump for a bicycle (Fig. P6.91) has a volume of 25 cm3 when fully extended. You now press the plunger (piston) in while holding your thumb over the exit hole so that an air pressure of 300 kPa is obtained
Recommending a database solution : In this assignment, you will prepare a report recommending a database solution for storing customers' information and order history that aligns with organizational needs and goals.
Find out what the estimated global proved reserve : Find out what the estimated global proved reserve of the mineral is today not including recycling (recycled material has already been removed from the earth, so it is not part of the proved reserve estimate).
Two mobile network routing protocols : OLSR and DSR are two mobile network routing protocols. Refer to [1] and briefly (in one paragraph) describe their similarities and differences.
Identify what specific behaviors you want to collect data : Find a crowded area where there are people for at least fifteen minutes (e.g., mall, restaurant, baseball game, or waiting room). Create a research question and hypothesis that has to do with people's behaviors in this environment. Identify what s..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the pressure at the forward and rear corners along the

A closed box with horizontal base 6m x 6m and height of 2m is half-filled with water and is accelerated Ax=4.9 m/sec^2 and Ay=-2.4 m/sec. find the pressure at the forward and rear corners along the bottom.

  What average thickness must the engineer build to meet these

An engineer uses a standard technique for measuring the thickness of a clay landfill liner that has a typical standard deviation of 0.7 in. The project specifications require the liner thickness to be 36 inches or more, at least 95 percent of the tim..

  What is the rated flywheel power for a cat 834h 4 wheel

What is the rated flywheel power for a CAT 834H 4 wheel tractor equiped with converter drive? What are the maximum speeds, for this machine in each of the four forward gears?

  Determine what is the first-order decay rate constant

A minimum contact time of 30 min is required to reduce the pathogen concentration from 100 pathogens/L to below 1 pathogen/L through a first-order decay process. You plan on treating water at a rate of 1,000 gal/min.

  Determine the time needed for block a to rise 3 m

The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine: a) the time needed for block A to rise 3 m b)the relative velocity of block A with respect to block B when this occurs.

  Calculate cracking moment for an unreinforced concrete beam

calculate the cracking moment (resisting moment) for an unreinforcedconcrete beam that is 10 in. wide, 16 in. high. assume normal weight concrete with 3000 psi = f prime sub c. use the internal couple method and check with the flexure formula.

  Determine the shannon capacity of such a system

Common telephone systems have a bandwidth of 3 kHz and a signal-to-noise ratio of 48 dB. Determine the Shannon capacity of such a system.

  What is the magnitude of the force exerted on the hammer

A barge is 60ft long, 20ft wide, and 8ft deep. When empty, it weighs 210,000lb, and its center of gravity is 1.5ft above the bottom. Is it stable when floating in water?

  For finding the elevation of point c the azimuth angle from

For finding the elevation of point C the Azimuth Angle from poit A to C is measured as 76deg ?15'00". The height of the instrument during this measurement was 1.60m

  Calculate the hydraulic conductivity of this clay

A falling-head permeability test was carried out on a clay soil of diameter 100 mm and length 150 mm. In 4 minutes the head in the standpipe of diameter 5mm dropped from 680 to 350 mm. Calculate the hydraulic conductivity of this clay.

  Determine how much should be paid for the bond

An investor is considering buying a 20-year corporate bond. The bond has a face value of $1000 and pay 6% interest per year in two semiannual payments. To receive 8% interest, compounded semiannually, how much should be paid for the bond

  Determine what is the maximum speed attained

The coefficient of rolling resistance can be taken to be a constant for all speeds, equal to 0.008. If the cyclist is coasting down a 6% grade, what is the maximum speed attained

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd