Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The USGS has maintained a stream gage on Big Creek at Hill City since 1964. The highest discharge recorded at this gage was 45,000 cfs in 1972. The base-10 logs of the annual peak discharges in cfs for WY 1965-2010 have a mean of 3.678 and a standard deviation of 0.456. Assume that the probability distribution of the annual peak discharges is log-normal (the logs of the annual peak discharges are normally distributed).
a. Find the 50-year discharge.
b. Find the return period of 1972 flood.
c. Find the discharge with an 80% risk of being equaled or exceeded at least once in the next 10 years. (Hint: first find the annual probability of exceedance for this discharge.)
A moist soil sample weighing 22.2 N has a moisture content of 20%. How man N of water must be added to the sample to increase the moisture content to 30%
The segment of river shown has a rectangular cross-section, with width 50 ft. The river bed is at angle theta=10 degrees from horizontal. The average velocity is 2 ft/s at the upstream end, and 3 ft/s at the downstream end.
An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
A computer technician can handle on average 5 service calls per day. The cost of adding a technician (C1) is $200 per day and the estimated cost of waiting per incident (C2) is $250 per day.
A block with an inclination of 20 degrees has a weight of 60kg, a height of 1.8m and width 1m, static friction is 0.3, what is the force needed and the height (where the force in the box should be) to pish it upwards
Given a sand with a moisture content of 10%, how much water needs to be added to bring the sand to a moisture content of 20%
The cost for maufacturing a component used in intelligent interface converters was $23000 the first year. The company expects the cost to increase by 2% each year. Calculate the presence worth over a 5 year period at an interest rate of 10% per ye..
A reinforced concrete column has 6 steel rods inserted in the column and the apparatus is subjected to a temperature drop of 90degrees F. from its stress free state.
The maximum hoop stress is (65000/2) psi and the maximum shear stress is 16000 psi. If the diameter of the tank is 7 inches,what is the minimum wall thickness.
Determine the required mass of block A so that when it is released from rest it moves the 5-kg block B a distance of .75m up along the smooth inclined plane in t=2s. Neglect the mass of the pulleys and cords.
What is the theoretical maximum amount of work that could be done by a gas in a piston expanding from 10 L to 20 L (pressure of the surrounding atmosphere is 100 KPa)
A hi-vol clean filter weighs 18.00 g. After a 24 hour sampling period the filter is removed and weighs 18.65 g. The initial flow rate through the filter was 2.5 m3/min.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd