Find the discharge with an risk of being equaled or exceed

Assignment Help Civil Engineering
Reference no: EM13546685

The USGS has maintained a stream gage on Big Creek at Hill City since 1964. The highest discharge recorded at this gage was 45,000 cfs in 1972. The base-10 logs of the annual peak discharges in cfs for WY 1965-2010 have a mean of 3.678 and a standard deviation of 0.456. Assume that the probability distribution of the annual peak discharges is log-normal (the logs of the annual peak discharges are normally distributed).

a. Find the 50-year discharge.

b. Find the return period of 1972 flood.

c. Find the discharge with an 80% risk of being equaled or exceeded at least once in the next 10 years. (Hint: first find the annual probability of exceedance for this discharge.)

Reference no: EM13546685

Questions Cloud

Why was the specific weight of water used to find the head : A beam must carry a total factored bending moment of 1062kN-m. It has a maximum beam effective depth of 25in. Design the beam in US customary units using f’c=4ksi and fy=413.4MPa. If necessary use d’=2.5in. Assume an exterior exposure according to AC..
Determine the tension in each of the cables at a time when : A long trough is supported by a hinge along its lower edge and a series of horizontal cables attached to its upper edge. Determine the tension in each of the cables, at a time when the trough is full of water.
Determine the design speed of the curve : An egual-tangent sag vertical curve is designed with the PVC at station 109+00 and elevation 950 ft, the PVI at station 110+77 and elevation 947.34 ft, and the low point at station 110+50. Determine the design speed of the curve.
The column bearing is 12 in. measured along the beam : A W24X94 beam on a 6 ft span underpins a column that brings 110 kips dead load and 280 kips live load to its top flange at a location 2.5 ft from the left support.
Find the discharge with an risk of being equaled or exceed : Find the discharge with an 80% risk of being equaled or exceeded at least once in the next 10 years. (Hint: first find the annual probability of exceedance for this discharge.)
Compute the ratio of the nominal flexural strength of the : Compute the ratio of the nominal flexural strength of the beam to the maximum service load moment, and compare your findings to the ACI load factors and strength reduction factor.
Derive an expression for acceleration in cylindrical : Perform this calculation using cylindrical coordinates. Cylindrical coordinates are the same as polar coordinates, with the addition of a third, z-axis.Recommend that the z-axis be placed up the axis of rotation for ?.
Compute the required weight of coarse aggregate per cubic : A concrete mix with a 3 inch slump, water cement ratio of 0.50 and sand with fineness modulus of 2.4 contains 1700 lb/yd^3 of coarse aggregate, compute the required weight of coarse aggregate per cubic yard
Objective mirror of the reflecting telescope : The 200-inch-diameter objective mirror of the reflecting telescope at the Mt. Palomar Observatory has a focal length of 17 . Part A The -number of a mirror is defined exactly the same as the -number of a lens. What is the -number of this mirror?

Reviews

Write a Review

Civil Engineering Questions & Answers

  How man n of water must be added to the sample to increase

A moist soil sample weighing 22.2 N has a moisture content of 20%. How man N of water must be added to the sample to increase the moisture content to 30%

  Calculate the rate of change of water mass in the segment

The segment of river shown has a rectangular cross-section, with width 50 ft. The river bed is at angle theta=10 degrees from horizontal. The average velocity is 2 ft/s at the upstream end, and 3 ft/s at the downstream end.

  What is the design speed of he curve

An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?

  Find the optimum number if technicians needed

A computer technician can handle on average 5 service calls per day. The cost of adding a technician (C1) is $200 per day and the estimated cost of waiting per incident (C2) is $250 per day.

  What is the force needed and the height to pish it upwards

A block with an inclination of 20 degrees has a weight of 60kg, a height of 1.8m and width 1m, static friction is 0.3, what is the force needed and the height (where the force in the box should be) to pish it upwards

  Find how much water needs to be added to bring the sand

Given a sand with a moisture content of 10%, how much water needs to be added to bring the sand to a moisture content of 20%

  Calculate the presence worth over a 5 year period

The cost for maufacturing a component used in intelligent interface converters was $23000 the first year. The company expects the cost to increase by 2% each year. Calculate the presence worth over a 5 year period at an interest rate of 10% per ye..

  What is the stress in the steel the stress in the concrete

A reinforced concrete column has 6 steel rods inserted in the column and the apparatus is subjected to a temperature drop of 90degrees F. from its stress free state.

  What is the maximum internal pressure in cylindrical vessel

The maximum hoop stress is (65000/2) psi and the maximum shear stress is 16000 psi. If the diameter of the tank is 7 inches,what is the minimum wall thickness.

  Determine the required mass of block a so that when it is

Determine the required mass of block A so that when it is released from rest it moves the 5-kg block B a distance of .75m up along the smooth inclined plane in t=2s. Neglect the mass of the pulleys and cords.

  Calculate how much heat must be added in the scenario

What is the theoretical maximum amount of work that could be done by a gas in a piston expanding from 10 L to 20 L (pressure of the surrounding atmosphere is 100 KPa)

  Determine what is the concentration of particles in the air

A hi-vol clean filter weighs 18.00 g. After a 24 hour sampling period the filter is removed and weighs 18.65 g. The initial flow rate through the filter was 2.5 m3/min.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd