Find the amount the company must deposit each year

Assignment Help Civil Engineering
Reference no: EM13313170

If a company wants to have $100,000 in a contingency fund 10 years from now, the amount the company must deposit each year in years 1 through 5, at an interest rate of 10% per year, is?

Reference no: EM13313170

Questions Cloud

Affect the analysis regarding any decreases or increases : How does the Congressional Budget Office "score" proposed changes to the income tax code?
What is the equivalent amount in year 10 of an expenditure : What is the equivalent amount in year 10 of an expenditure of $5,000 in year one, $8,000 in year two, and increasing by $1,000 per year through year 10 Assume the interest rate is 10% per year.
How to calculate the ph of a buffer solution : Calculate the pH of a buffer solution that is 0.250 M in HCN and 0.170 M in KCN. For HCN, Ka = 4.9 x 10^-10 (pka = 9.31). Use the equilibirum approach to calculate
Find the magnitude of the work done by the force of friction : A 16.8 kg block is dragged over a rough, horizontal surface by a constant force of 123 N acting at an angle of angle 34.9 above the horizontal. Find the magnitude of the work done by the force of friction
Find the amount the company must deposit each year : If a company wants to have $100,000 in a contingency fund 10 years from now, the amount the company must deposit each year in years 1 through 5, at an interest rate of 10% per year, is
Compute the speed of sound in air : A tuning fork with a frequency of 440Hz is held just above the top of a uniform glass tube containing water, What is the speed of sound in air
The steps involved in the purchases cycle and the importance : The steps involved in the purchases cycle and the importance of each
Determine the maximum shearing stress in shaft ab : A torque of magnitude T = 1000Nm is applied at D as shown. Knowing that the diameter of shaft AB is 56 mm and that the diameter of shaft CD is 42 mm, determine the maximum shearing stress in (a) shaft AB, (b) shaft CD.
What is the total flux across the coil : A long straight ideal solenoid of radius 6 cm, with 150 turns/m passes (on axis) through the center of a flat circular coil, What is the total flux across the coil, as a function of time

Reviews

Write a Review

Civil Engineering Questions & Answers

  What kind of soil labs are good for the construction

What kind of soil labs are good for the construction which is underlying the wet clay is dense sand. For example, compaction, and so on.

  What is appropriate pressure at the point of max stenotic

Blood is flowing through an aorta of 1.0 cm diameter at an average velocity of 50 cm/s. The mean pressure is 100 mm Hg, The blood enters a stenosis where the aortic diameter is 0.5 cm. What is the appropriate pressure at the point of maximum steno..

  Determine what is ph of the solution at equilibrium

Calcium sulfate (CaSO4, solubility product Ksp=2*10^-5 M^2), is added to initially pure water, such that solid CaSO4 remains at equilibrium. (Assume the sulfate does not participate in reaction other than the solubility product; no HSO4- formed).

  Calculate size of an anaerobic digester required to treat

Calculate the size of an anaerobic digester required to treat the sludge from a primary clarifier designed to treat 38,000 m3/d of sewage. The quantity of dry volatile solids removed by the plant is 0.15 kg dry solids/m3 sewage.

  How many pounds of cargo will result in an increase of draft

a ship has a cross-sectional area of 4000 ft^2 at the water line when the draft ( depth below the water line of the vessel bottom) is 10 ft. How many pounds of cargo will result in an increase of draft of 2 in ( specific weight is 64 Ib/ft^3 )

  Is the plant in violation of the deq discharge limit

Immediately upstream of the treatment plant, the Pine River has an ultimate CBOD of 2 mg/L and a flow of 9 × 105 m3/day. At a distance of 20 km downstream of the treatment plant, the Pine River has an ultimate CBOD of 10 mg/L.

  Determine what is the stationing and elevation of the pvc

A vertical curve is designed for 55 mi/h and has aninitial grade of +2.5% and a final grade of 1.0%. The PVT is at station 114 + 50. It is known that a point onthe curve at station 112 + 35 is at elevation 245 ft.

  What length of existing level highway must be reconstructed

at a railroad crossing, an overpass must be built centered over the tracks at a height of 24ft and be 200ft long. the existing highway has a design speed of 50mi/hr.

  What is the average length of queue

Vehicles arrive at a toll booth with a mean arrival rate of 2 veh/min (the time between arrivals is exponentially distributed). The toll booth operator processes vehicles (collects tolls) at a uniform deterministic rate of one every 20 seconds. Wh..

  Find how many assemblies the inspector may inspect per min

A grievance has been filed by the union at Dorben Co. regarding the final inspection station, in which the operator slightly lifts a 20 lb assembly, examines all sides, and, if acceptable, sets it back down on the conveyor, where the assembly goes..

  Integrate the rate equation and solve for the concentration

Investigators have determined that the rate equation for bacterial kill in batch chlorine contact chambers is: rxn rate = dC/dt=-kCt where C is the concentration of bacteria, k is the rate constant, and t is time.

  Determine the braking distance downhill and percent grade

Assuming that the coefficient of friction between the tires and the pavement is 0.30, determine the braking distance downhill and the percent grade of the highway at that section of the road.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd