a ferric chloride dosage of 40 mg/l and an equivalent dosage of lime are used to coagulate a water.
(a) how many pounds of ferric chloride per million gallons are used?
(b) how many pounds of hydrated lime per million gallons are used, assuming a purity of 70 % CaO?
(c) how many pounds of ferric hydroxide are theoretically produced per million gallons of water treated?
The current removal efficiency is 96% for an air flow rate through the separator equal to 18 m3/s. Due to a process change, the air flow rate is expected to increase to 22 m3/s.
The town needs a total of 2 mgd. The capacity of well 1 is 5 million gallons per day, and that of well 2 is 10 mgd. Using calculus (hint: calculus with substitution), determine the optimal amount of water that will be drawn from each well
how many kilograms each of pearlite and preutectoid phase form? schematically sketch and label the resulting microstructure
Thirty six year old Johnson was in his last semester of his graduate program in Civil engineering. Father of two small children, he was anxious to get his degree so that he could spend more time with his family.
If the hydraulic head in the canal is 100 ft and in the drainage ditch it is 80 ft calculate the maximum mounding height and the mounding distance from the canal that will occur if the farmer irrigates at a rate of 2 acre-ft/acre/year.
A membrane biological treatment plant effluent must be disinfected to what level prior for use as unrestricted recycled water. For a flow of 4 mgd and peak flow of 6 mgd, how many lamps are required
If the 10-lb block passes point A on the smooth track with a speed of va = 5 ft/s determine the normal reaction on the block when it reaches point b.
However, design codes which deal with shear friction design place an upper limit on the magnitude of the shear force for which the plane can be designed. Explain why this is so.
fy=50000psi, f'c=3000 span of l=28 ft, dead load not including beam weight = 3 k/ft, live load=3 k/ft, p*=0.5pb, concrete weights=150 lb/ft cubed, use h=d+2.5 inch, assume beam weight =10kN/m and phi=0.90
50 kmol per hour of air is compressed from p1 = 1.2 bar to P2 = 6.0 bar in a steady-flow compressor. Delivered mechanical power is 98.8KW. Temperature and velocities are: T1= 300K T2= 520K u1= 10m s^-1 u2= 3.5m s^-1
A signal approach has 20 seconds of displayed green, 4 seconds of yellow, and 3 seconds of all red (assume typical start-up, lost time, and clearance time). The cycle length is 60 seconds.
What is the equivalent amount in year 10 of an expenditure of $5,000 in year one, $8,000 in year two, and increasing by $1,000 per year through year 10 Assume the interest rate is 10% per year.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd