Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
design a flocculation compartment for a horizontal shaft flocculator with two paddles. the water tempearture is 10 degree celusis. how fast must the paddle wheel rotate in that compartment to generate a G(velocity gradient) value30 s-1?
The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?
An undisturbed soil sample has a total unit weight of 19.4 kN/m3, a dry unit weight of 16.9 kN/m3, and a specific gravity of soil solids (Gs) of 2.69. If the sample could be saturated without changing its porosity, calculate the amount of water (i..
A 175 Mi^2 watershed has a 4200 acre reservior within its boundary . The annual watershed runoff to the reservior is 13in. A flow of 120 mgd (368 ac-ft/day) is to be drafted from the reservior. The annual rainfall is 38in.
At the instant when angle theta= 50 degree, the horizontal guide is given a constant upward velocity v0 = 1.3 m/s. For this instant calculate the force N exerted by the fixed circular slot and the force P exerted by the horizontal slot on the 0.60..
You add 100 mg/L of glucose to pure water, then decide that this was a mistake and decide to remove it biochemically before you serve the water to your friends at a cocktail party. To remove the glucose, you seed the water with a harmless bacteria..
Design a series of closely spaced parallel box beams that will support an asphalt road surface over a 10 foot wide, 40 foot long span. The hollow box beams are made of concurred and imbedded No. 8 steel rods (1 inch dia.).
Explain how the presence of the collimation error, e, can be detected in a "Two Peg Test" operation.
For a total floor load of 75 psf on 2x floor framing at 24 o.c., determine an appropriate plywood thickness and span rating assuming panels with edge support and panels oriented perpendicular to the framing. Specify the minimum fasterners and spac..
a job requires excavating and hauling 500 cyds (in situ) of sandy soil. in your posession is an excavator and a dump truck (capacity 30 cyds loose) the dump truck has a round trip travel time of 5 mins and 45 secs to the dump site and back.
The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the height above the waterline of its center of Gravity (G).
As a project manager on site where work for 3 km long tunnel has been undertaken the site is remote and takes about 2 days to travel to nearest town supervisors technicians and skiled workers in dangerous work.
a) The maximum flow rate that can be achieved without cavitation occurring in the piping system. b) The maximum elevation of the highest point of the piping system to avoid cavitation.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd