Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two routes connect a suburban origin and a city with performance functions given as:
Route #1: t1 = 6 + 8[x1/c1]Route #2: t2 = 10 + 3[x2/c2]
with travel time t (in minutes), and route volume x and capacity c (both in kvph). Current route 1 and 2 capacities are 4.0 and 2.0 kvph, respectively. The routes are currently in user equilibrium. A reconstruction project on route 1 reduces capacity to 3.0 kvph, but total travel demand is unaffected. Field studies note a 35.28 sec increase in average travel time on route 1 and a 68.5% increase in flow volume on route 2 after reconstruction begins. If both routes are always used, estimate equilibrium flows and travel times before and after reconstruction begins.
A vertical curve is formed when a rural highway passes under a bridge joining a -8% grade to the horizontal grade satisfying the requirement for safe speed of 90 Km/hr . Determine the minimum clearance required betewen the highway pavement surface..
a tension member with cross-sectional area 3 in2 resists a load of 10 kips. How do you Calculate the normal and shear stress on planes making a 0, 20, 45, and 60 angle with the transverse section.
1. What does the acronym ANSI stand for Stands for American National Standards Institute 2. What is the purpose of a titleblock The purpose of a title block is for give us enough information about the project.
assuming that the contaminant travels mainly by advection, propose any operational changes to the given layout to prevent the river from being contaminated.
How do you find the force ratio equation to determine the maximum total load that can be applied to a truss? Given a force of a member how do you find the force ratio?
If the elevation of the pipeline at the treatment plant is 125 m, estimate the pressure in the pipeline 1 km downstream where the elevation if 110 m. Hint: Use the Colebrook equation to estimate f, and the energy equation to estimate P2 .
you fill a 2-cubic foot wheelbarrow to the top with aggregate. if the specific gravity of the aggregate is 2.548 and 18% of the aggregate is void spaces, how much does the aggregate in the wheelbarrow weight?
Describe the application of geophysical techniques using electromagnetic induction as a tool for sustainable soil and water management of agricultural fields in the humid tropic Caribbean 300 word limit.
Determine the deflection of the right end of the pointer and the maximum deflection of the beam.
A 48-in water main carries 79 cfs and branches into two pipes at point A. The branching pipes are 36 and 20 in. in diameter and 2800 and 5000 ft long, respectively. These pipes rejoin at point B and again form a single 48-in.
The velocity of the center point of the wheel is constant at 20 ft/sec to the right. For the instant, determine the following: a) The velocity and acceleration of point B (which is attached to the wheel) measured with respect to ground.
Calculate the (maximum) design load on a hollow AISI 1020 steel shaft with an outside diameter of 2.5 inches and an inside diameter of 2 inches. Assume a safety factor of 2.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd