Freight car loadings over an 18-week period at a busy port are as follows:
Week
Number
1
250
7
295
13
410
2
260
8
325
14
415
3
270
9
355
15
435
4
10
345
16
445
5
11
375
17
455
6
275
12
405
18
465
a. Determine a linear trend line for expected freight car loadings. (Round your intermediate calculations and final answers to 2 decimal places.)
b. Use the above trend equation to predict expected loadings for Weeks 20 & 21. (Round your final answers to 2 decimal places.)
The forecasted demand for Week 20 is and for Week 21 is .
c. The manager intends to install new equipment when the volume exceeds 830 loadings per week. Assuming the current trend continues, in which week (at the earliest) should the loading volume reach that level? (Use the rounded answers, as required, from any previous part of this problem. Do not round any other intermediate calculations. Round your final answer to 2 decimal places.)
The lead time for paper delivery is normally distributed with a mean of 4 days and a standard deviation of 1 day. A 97% service level is expected. Compute First's ROP.
Write a report applying two models for strategic planning formulation. You may choose to report on the feasibility of a business you want to start
A company may develop an emergent strategy due to
Using a spreadsheet, prepare a roll-up estimate of your project costs. To prepare your estimate, follow these guidelines: Use a completely decomposed WBS as your basis. Identify your labor resource requirements against the WBS.
A cost estimate for a given project activity is $6,300; this cost estimate does not factor in personal time. Assuming that an allowance for personal time is 9.5%.
The time study analyst ad Dorben company developed the following snapback stopwatch readings where element performance rating was used. The allowance for this element was assigned a value of 16 percent. What would be the standard time of this elem..
You have been hired by a small new Web design firm to set up a network for its single office location. The network is primarily needed for exchanging files, accessing and managing beta Web sites on their Web server, and connecting to the Internet. Id..
A company can produce a part it uses in an assembly operation at the rate of $50 an hour. The company operates 8 hours a day, 300 days a year. Daily usage of the part is 300 parts. While production is occurring, how many parts per day are being added..
Would you rate them low, medium, or high with respect to profitability? · Would you rate them low, medium, or high with respect to risk? · What is your recommendation to management? Why?
Focus on mutual engagement and shared diagnosis, and her plan to "reorganize HP in order to centralize decision making, revitalize the sales force, trim costs and energize employees."
Comment on the two code of ethics websites for coders at AAPC and AHIMA: American Academy of Professional Coders and AHIMA. How are they different? How are they the same?
What method does a T1 use to acheive high throughput over twisted pair wiring?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd