Q. If a plant was designed to produce 7,000 hammers per day but is limited to making 6,000 hammers per day because of time needed to change equipment between styles of hammers, illustrate what is utilization?

Q. Locate an organization that has used vertical integration as a supply chain strategy. Express in detail Explain why you believe vertical integration was/was not appropriate strategy. Support your answer.

 

Reference no: EM1375152

Questions Cloud

Calculating the opportunity cost : Assume that the Kiribati can manufacture 1000 tons of breadfruit or 500 tons of fish, and that Tuvalu can manufacture 750 tons of breadfruit or 1875 tons of fish.
Explain how many seats should super discount overbook flight : Airline knows from past history that an average of 25 customers cancels ir reservation or do not Show for flight. Revenue from a ticket flight is $125. By explain how many seats should super discount overbook flight.
Explain how that organization maintains competitive pros : Explain how that organization maintains or attempts to maintain competitive pros. Illustrate what do they do well. Illustrate what improvements could they make? Support your answer.
Determine the price of white socks : The following table explaines the production possibilities of 2-cities in the nation of Boston, determine the price of white socks in terms of red socks in Boston?
Express in detail why you believe vertical integration : Locate an organization that has used vertical integration as a supply chain strategy. Express in detail why you believe vertical integration was/was not appropriate strategy.
Benefits of free trade : Economists are in almost universal contract that Free Trade is good for all nations. Explain why are they in such universal contract?
Determine process velocity : Mop and Broom Manufacturing approximate that it takes 4½ hours for each broom to be produced, from raw materials to final product. An evaluation of process reveals that amount of time spent working on product is 3 hours. Determine process velocity..
Explain why is it so important for businesses to understand : Illustrate what is meant by moment of truth in service design. Explain why is it so important for businesses to understand this concept.
Heckscher ohlin theory : For a world in which international trade would be according to the differences featured in the Heckscher-Ohlin theory, the shift from no trade to free trade is like a zero-sum game.

Reviews

Write a Review

 

Operation Management Questions & Answers

  What the optimal number to order would be for this company

Each time they order it cost the company 150 dollars. Using the price break table below please decide illustrate what the optimal number to order would be for this company.

  Discussed the importance of controlling labour costs

During the interview process, one of the key items discussed was the importance of controlling labour costs. The current owners feel that a master schedule needs to be developed to help meet the labour cost budget and ensure maximum productivity f..

  Illustrate what percentage of time will facility be produce

Holding costs are $2 per item per year and ordering costs are $30 per order. Illustrate what percentage of time will the facility be producing components.

  For production combination which resource is slack

For production combination of 800 boxes of Deluxe and 600 boxes of Classic which resource is slack (not fully used).

  Explain how you would convert each continuous measure

Explain how you would convert each of these continuous measures into discrete information by comparing the continuous measure to a threshold value.

  Determine the economic order quantity

Determine the economic order quantity, the reorder point, total annual cost using the EOQ, if cost per tire is $35.00, holding cost is 20% of tire cost per year, demand is 1000 per year ordering cost is $20.00.

  Elucidate what is average cost per unit if the work force

Elucidate what is the average cost per unit if the work force is maintained at a level so which overtime can be used to the maximum of 25% of regular hours during the peak period in period 5.

  Illustrate what is the efficiency of the process

Illustrate what is the possible daily output of this "process" if 8 hours of processing time is available each day. Given your output in part a, illustrate what is the efficiency of the process.

  Illustrate what constraint would you add

Kruger will enhance its citywide image in Miami if it can outsell other local stores in total number of rolls of Super trex next year. Illustrate what constraint would you add.

  Explain how would you recover from this service crisis

Suppose you were manager of a restaurant and you were told h1stly that a couple eating dinner had just seen a mouse. Illustrate what would you say to them. Explain how would you recover from this service crisis.

  Find out examples of systems analysis application

find out examples of systems analysis application outside of software development for the above please emphasize on the systems analysis bit - discuss why systems analysis has been:

  Explain how a monte carlo simulation could facilitate

Explain how a Monte Carlo simulation could facilitate a sensitivity analysis of the probabilities of the payoff.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd