Reference no: EM131392505
Assignment Objectives
Explain the need for effective project and team communications systems to keep stakeholders informed of project status.
Describe the need to manage project scope throughout a project's life cycle to provide closure to a properly executed project.
Use effective communication techniques.
Assignment Description
You have completed the project planning activities and are now ready to share the results with the project team. You have scheduled a project kick-off meeting in two weeks and are now preparing your materials.
Using the Library, develop a 10 - 15 slide presentation that you will use for the kick-off meeting. In the presentation, identify the participants of the meeting, the objectives of the meeting, the meeting agenda, and the project's objectives. Use the remaining slides to share key results from your project planning activities, such as the scope control system and the communication mechanisms that will be used.
In the communication plan, identify the audiences that must be reached. For each audience, describe the communication mechanism, the frequency of communication, the format, other involved parties, and associated responsibilities.
Be sure your presentation meets the standards for an effective presentation that you have learned in other courses.
Determine its weight in english engineering units
: An object has a mass of 10 kg at a location where the acceleration of gravity is 9.81 m/s2 .
|
The economy is in recession
: The economy is in a recession. Which of the following is a fiscal policy that the government should adopt to strengthen the economy?
|
Explain why this is a convenient mass unit
: The British Gravitational System uses the mass unit slug. By definition, a mass of 1 slug is accelerated at a rate of 1 ft/s2 by a force of 1 lb. Explain why this is a convenient mass unit.
|
Develop a comparator circuit that goes high
: A sensor provides temperature data as 360 µV/°C. Develop a comparator circuit that goes high when the temperature reaches 530°C.
|
Explain the need for effective project communications system
: Explain the need for effective project and team communications systems to keep stakeholders informed of project status.Describe the need to manage project scope throughout a project's life cycle to provide closure to a properly executed project.Use e..
|
Clothing the consumer could afford with his budget
: A consumer has a monthly income of 1000 dollar that he allocates among two goods: food and clothing. Suppose the price of clothing is pC = 50 and the price of food is pF = 20. Illustrate the various combinations of food and clothing the consumer coul..
|
Develop a hysteresis comparator to provide required output
: Noise is found to contribute of intensity fluctuations. Develop a hysteresis comparator to provide the required output and immunity for noise.
|
Determine the force in newtons
: Deceleration is sometimes measured in g's or multiples of the standard acceleration of gravity. Determine the force, in newtons, that an automobile passenger whose mass is 68 kg experiences if the deceleration in a head-on crash is 50g.
|
Find the output voltage produced
: A 6-bit DAC has an input of and uses a 10.0-V reference.- Find the output voltage produced.- Specify the conversion resolution.
|