Explain metallurgical balance in mineral processing

Assignment Help Civil Engineering
Reference no: EM13143091

Metallurgical balance in mineral processing
Assume 2000 short tons of ore were mined, 200 tones were rejected as waste and the tonnage accepted for metallurgical treatment is 1800. Assay for the feed is 4%, for the concentrate is 4.4% and for the waste, 0.4%.

Reference no: EM13143091

Questions Cloud

Prepare journal entry to record this transaction : the land carried a value of $250,000. Nikle paid $300,000 down in cash and signed a note payable for the balance. Prepare the journal entry to record this transaction.
Provide the full web address : In this final paper, you will locate a credible website, preferably a government website that chronicles the financial costs of the chronic condition you have been focusing on this term. Provide the full web address. Your instructor will check.
Accounting equation for vajen : Vajen Company issued 5,000 shares of $1 par common stock for $30 per share, providing the company with $150,000 in cash. What effect, in addition to the increase in cash, does this transaction have on the accounting equation for Vajen?
Determine whether the correlation in the population is zero : Test to determine whether the correlation in the population is zero, versus the alternate hypothesis that the correlation is greater than zero. Use the 0.05 significance level.
Explain metallurgical balance in mineral processing : Metallurgical balance in mineral processing, Assume 2000 short tons of ore were mined, 200 tones were rejected as waste and the tonnage accepted for metallurgical treatment
How many grams of the precipitate can be formed : A solution of 120 mL of 0.150 M KOH is mixed with a solution of 280 mL of 0.250 M NiSO4. How many grams of the precipitate can be formed?
Preferred method of using adjusting from cost : Describe the preferred method of using adjusting from cost to market for material inventory write downs?
How much of net income : interest on original investment at 10%, salary allowances of $28,803 and $30,420 respectively, and the remainder equally. How much of the net income of $118,415 is allocated to X?
Explain break even stripping ratio : Break Even Stripping Ratio (BESR), Given an underground total mining cost of $8.85 per tonne, surface mining costs of $2.95 per tonne of ore, and surface mining stripping costs of $1.75 per tonne of waste

Reviews

Write a Review

Civil Engineering Questions & Answers

  Coefficient of static friction between pacakges

The belt starts from rest at time t=0 and its speed increases at a constant rate of 150mm/s^2. Knowing that the coefficient of static friction between the pacakges..

  What is the angle of inclination of the plane

A body slides down a frictionless plane and during the third second after starting from rest if it travels 20.4m. What is the angle of inclination of the plane?

  Determining transformed moment of inertia

Determine the transformed moment of inertia for the beam using steel as the reference material. Express your answer in in^4 to the nearest 0.1 in^4.

  Temporary change on the highway

Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.

  Power plant efficiency problem

A 600 MWe power plant has an efficiency of 36% with 15% of the waste heat being released to the atmosphere as stack heat and the other 85% taken away in the cooling water.

  Commencement of fill placement

Determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement.

  Maximum rod diameter on lathe machine

If the tensil testing machine can apply no more than 925 lbs. of force to the specimen, calculate the maximum rod diameter that should be used. (precision 0.000)?

  Shear tension and bending of the fixed i-beam

To satisfy desige limitation it is necessary to determine the effect of the 2- kN tension in the cable on the shear tension and bending of the fixed I-beam.

  Chlorination tank for killing microorganisms

You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m 3 /hr.

  Esimating the capacity of the roadway

Given s=.30/(60-u), where s is the spacing (space headway) in miles, and u is the speed in miles per hour, derive the relationships u-k, u-q, and q-k. Also, estmate the capacity (qmax) of the roadway.

  Gathering the data information

What additional data and information should he gather,and how should he go about gathering the data information ?

  Darcy law and quantity of groundwater

Using Darcy's Law, calculate the quantity of groundwater (L/day), the seepage velocity (m/s), and the contaminant loading (Kg/day) to the river (assuming no retardation) for the following scenario. Be sure to include both a plane view and cross-se..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd