Explain indicated concentrations of total volatile solids

Assignment Help Civil Engineering
Reference no: EM13142626

Influent sample collected from a wastewater treatment plant was analyzed for various solids concentrations. Results indicated concentrations of Total Volatile Solids (TVS), Total Fixed solids (TFS), and Total Dissolved Solids (TDS) to be 300 mg/L, 80 mg/L, and 150 mg/L respectively. If the wastewater flow rate into the treatment plant is 10 million gallons per day (mgd), calculate the mass of suspended solids loading per day.

Reference no: EM13142626

Questions Cloud

Define water circulating through it at the rate : A 4 X 8-ft solar collector has water circulating through it at the rate of 1.0 gallon per minute while exposed to sunlight with intensity 300 Btu/ft^2-hr.
Evidence about specific accounts and classes of transactions : Analytical procedure are substantive procedures that may be used to provide evidence about specific accounts and classes of transactions.
Curriculum and cocurriculum : Some educators, both in curriculum and cocurriculum, have known intuitively that students learn with their hearts as well as their minds, in class and out of class, through thinking and feeling and through thinking about their feelings."
Difference between actual and budgeted costs : At normal capacity of 8,000 units, budgeted manufacturing overhead is: $48,000 variable and $135,000 fixed. If Wayman had actual overhead costs of $187,500 for 9,000 units produced, what is the difference between actual and budgeted costs
Explain indicated concentrations of total volatile solids : Influent sample collected from a wastewater treatment plant was analyzed for various solids concentrations. Results indicated concentrations of Total Volatile Solids (TVS)
Determining foreign exchange gain : When the receivable was collected on February 15, 2009, the U.S. dollar equivalent was $144,000. In Mills' 2009 consolidated income statement, how much should have been reported as a foreign exchange gain?
Find correlation between test and the bdi : The correlation between his test and the BDI was r =.14. Evaluate this correlation. What does this correlation tell us about the relationship between these two instruments?
Amounts to be recorded for the building : Also, the partnership will assume responsibility for a $30,000 note secured by a mortgage on that building. Wright will invest $50,000 cash. For the partnership, the amounts to be recorded for the building and for Chen's Capital account are ??
Explain important information about short essay : Important information about Short essay, In managing the uncertainties of ethical issues in engineering, what are some questions that we may ask to limit some of the risk

Reviews

Write a Review

Civil Engineering Questions & Answers

  Total vehicle delay in the cycle with queueing diagram

If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Complete cycle of the motion

Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)

  Principal stresses and the orientation of planes

A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..

  Calculate the total drilling cost

Calculate average figures for tonnes/round and powder factors in kg/tonne and Determine the drill metres required to achieve a production rate from grade control blasting.

  Lifting granite rock from the bottom of lake

A 170 kg granite rock (ρ = 2700 kg/m 3 ) is dropped into a lake. A man dives in and tries to lift the rock. Determine how much force the man needs to apply to lift it from the bottom of the lake. Do you think he can do it?

  Critical review decision making of failed major construction

Critical review the decision making of a failed major construction/property project within the UK in the last ten years.

  Length of contracted rectangular weir

A trapezoidal canal 6m wide at the bottom and having a side slope of 1V:2H carries water with a mean velocity of 1.0m/s to a depth of 60cm. What length of contracted rectangular weir 1.0m high should be placed at the middle of the canal to make th..

  Designing the tangent vertical curve

Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?

  Darcy-weisbach equation for flow in a pressure conduit

In using the Darcy-Weisbach equation for flow in a pressure conduit, what percentage error is introduced in Q when f is misjudged by 20 percent?

  Determine the moment of the force

A force, 90 N in magnitude, is applied to control rod AB as shown. Knowing that the length of the rod is 225 mm, determine the moment of the force about point B by resolving the force into components along AB and in a direction perpendicular to AB..

  Embankment for a highway

An embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit. the water contenet of the sandy soil in the borrow pit is 15%& its void ratio is 0.69.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd