A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction project involves a major realignment of the highway such that a 60mi/h design speed is attained. at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and if the existing curve is inadequate,compute a satisfactory curve length.

Reference no: EM13302423

Questions Cloud

What must be the airspeed above the wing to create lift : A hang glider and its passenger has a mass of 95kg. The wing has an area of 11.0m^2. what must be the airspeed above the wing to create lift
Calculate the covariance between stock c and stock d : If the correlation coefficient between stock C and stock D is +1.0% and the standard deviation of return for stock C is 15% and that for stock D is 30%, calculate the covariance between stock C and stock D.
The most important factor in organizational success : Employee behavior is the most important factor in organizational success.
Evaluate the mass of the planet : You land on a new planet with radius 5000km. You measure the freefall acceleration due to gravity to be 8.5m/s^2 at the surface
Explain how to compute a satisfactory curve length : at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction d..
What are some of the real costs a company must face : What are some of the real costs a company must face in preparing quarterly earnings guidance? Please provide examples.
Find the frictionless force at the floor : a uniform 12.0kg ladder is 4.0m long and is placed against a frictionless wall at 30 degress. find the frictionless force at the floor necessary to maintaain equilibrium
Find what is the expected capital gains yield : For the coming year, what is the expected capital gains yield? Round your answer to two decimal places.
The pros and cons of using an established internet fulfill : Beginning as a single retail store in 1995, ChipSupreme (Chips) has grown to $50 million in annual revenues today. Chips was the brainchild of four entrepreneurial women who wanted to offer baked goods incorporating chocolate chips in both trad..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Calculate the coefficient of consolidation

For the soil and foundation conditions in fig. 1, determine the time required to reach 75% consolidation in the clay given the consolidation test results and determine the coefficient of consolidation

  Calculate the stoichiometric quantity of cl2 required

Aqueous sodium cyanide wastes at a metal processing industry are to be treated with chlorine and NaOH. Calculate the stoichiometric quantity of CL2 required daily to destroy the cyanide from 5 Kg of NaCN.

  What is the annual power cost of the ro system

Is the system within membrane manufacturer's warranty requirement of maximum flux rate of 14 gfd? What is the annual power cost of the RO system?

  How man n of water must be added to the sample to increase

A moist soil sample weighing 22.2 N has a moisture content of 20%. How man N of water must be added to the sample to increase the moisture content to 30%

  Determine diameter of the shaft at allowable shear stress

The pulley at B is connected to a motor that is driving the system. The other three pulleys are consuming the power delivered by Pb . Pa = 20kW, Pb = 75kW, Pc = 30kW, and Pd = 25kW and the shaft is rotating at 120rpm.

  Show that the ratio of mean shear to the wall shear rate

for a laminar flow of a newtonian fluid in a tube of a circular cross section, show that the ratio of mean shear to the wall shear rate is 2/3

  Find the maximum area that the rancher can enclose

A rancher has 1200 ft of fencing to enclose a double paddock with two rectangular regions of equal areas. find the maximum area that the rancher can enclose.

  Find the book value of the machine at the end of 2 years

At a local engineering firm, a supervisor thinks about buying a new copy machine for $700 but only wants to keep it for 3 years. Using the DDB find the book value of the machine at the end of 2 years.

  How many metric tons per day of nox are emitted

A coal-fired power plant produces a net electrical output of 500 MW. The composition of the coal burned is C= 72 %, H= 6 %, S= 3.5 %, O= 6 %, N= 1 %, and ash= 12 % by weight. It's heating value (HV) is 30200 kJ/kg. The net thermal efficiency is 36..

  Calculate the maximum tensile load in n

Consider a cold worked C11000 copper alloy rod 21 mm in diameter and 250 mm in length. Calculate (a) the maximum tensile load, in N, and (b) the maximum length, in mm, to which the rod may be stretched without plastic deformation.

  Esimating the capacity of the roadway

Given s=.30/(60-u), where s is the spacing (space headway) in miles, and u is the speed in miles per hour, derive the relationships u-k, u-q, and q-k. Also, estmate the capacity (qmax) of the roadway.

  What is the concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd