Evaluate the time interval required to empty

Assignment Help Other Engineering
Reference no: EM13872113

A woman is draining her fish tank by siphoning the water into an outdoor drain, as shown in Figure P14.74. The rectangular tank has footprint area A and depth h. The drain is located a distance d below the surface of the water in the tank, where d >> h. The cross-sectional area of the siphon tube is A+. Model the water as flowing without friction. (a) Show that the time interval required to empty the tank is given by (b) Evaluate the time interval required to empty the tank if it is a cube 0.500 m on each edge, if A = 2.00 cm2, and d = 10.0 m. 

1296_siphoning the water into an outdoor drain.jpg

Reference no: EM13872113

Questions Cloud

Question regarding the bernoulli effect : If the wings have surface area of 1200m2, how fast must the air flow over the upper surface of the wing if the plane is to stay in the air? Consider only the Bernoulli effect.
How much interest expense would be reported on the income : How much interest expense would be reported on the income statement for the year ending December 31, 2014? How would the balance of $375,201.09 at December 31, 2014 be reported on a balance sheet as of that date?
Analyzing a property of an algorithm : Problems in Computer Science are often classified as belonging to a certain class of problems (e.g., NP, Unsolvable, Recursive). In this problem you will be analyzing a property of an algorithm whose classification is not known for all possible in..
Comparing two different capital structures-equity plan : The NBA Corporation is comparing two different capital structures, an all-equity plan (Plan I) and a levered plan (Plan II). Under Plan I, NBA would have 200 shares of stock outstanding. Under Plan II, NBA would have 100 shares of stock and $5,000 in..
Evaluate the time interval required to empty : (a) Show that the time interval required to empty the tank is given by (b) Evaluate the time interval required to empty the tank if it is a cube 0.500 m on each edge, if A = 2.00 cm2, and d = 10.0 m.
Create a program to print a battleship grid to the console : Create a program to print a battleship grid to the console
Prepare journal entries to record acquisition of building : Prepare the journal entries to record The acquisition of the building and inception of the mortgage loan payable and The first mortgage payment on June 30, 2014.
Ratio of radius of aluminum sphere : A uniform lead sphere and a uniform aluminum sphere have the same mass. What is the ratio of the radius of the aluminum sphere to the radius of the lead sphere?
Determine the difference h in the heights : A U-tube open at both ends is partially filled with water (a). Oil having a density of 750 kg/m3 is then poured into the right arm and forms a column L = 5.00 cm high (b) (a) Determine the difference h in the heights of the two liquid surfaces.

Reviews

Write a Review

Other Engineering Questions & Answers

  Question 1a the use of satellites in rf communication

question 1a the use of satellites in rf communication system is a great deal fact in everyday life.i explain in detail

  How did presidential addresses and supreme court rulings

Conduct an Internet search to answer the question: How did Presidential addresses and Supreme Court rulings begin to change the lives of the American people beginning in the mid-20th century?

  Reading output voltage from potentiometer voltage divider

Wire the circuit for Reading the output voltage from Potentiometer Voltage Divider. Verify and upload the sample program, adjust the potentiometer to display reading on the serial monitor

  Determine the minimum acceptable wall thickness

Determine the minimum acceptable wall thickness using thin cylinder theory and determine the minimum acceptable wall thickness using thick cylinder simulation software.

  Calculate the loss of potential energy

A person of weight 100 kg standing on skis 2 m long and 0.10 m wide slides on the 2° mountain slope. at 0°C. Calculate the loss of potential energy when the ski slides a distance equal to its own length. Hence calculate the average thickness of th..

  Mass of a moist sample

The mass of a moist sample of soil is 20.7 kg. The total volume of the sample before drying is 0.011m3

  How many address bits are needed for each ram chip

How many address bits are needed for each RAM Chip

  Project management for engineering

economic feasibility of the projec, restrictions are the economics of the project based,  technical feasibility for the project

  Write a paper about sampling and data collection plan

Write a paper about Sampling and Data Collection Plan. Using the scenario and two variables your learning team developed for the Business Research Project assignment

  Difference between reliability and durability

Explain the difference between reliability and durability and how they can be specified in a product development programme.

  Present value plot for projects

Given the following Present Value Plot for Projects A and B, which are mutually exclusive projects, answer the following questions:

  Formulate a maximum-flow problem

Formulate a maximum-flow problem that will determine the maximum number of people that can travel to the safe facilities

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd