Reference no: EM131661044
Finalize Project Schedule and Mitigate Any Delays
Competency
Evaluate the concepts of work breakdown structure, coding, forecasting, and scheduling as project control functions.
Scenario Information
You are assuming the role of the project manager for a company called SuperPacks to provide a new backpack product with a built-in refrigeration pouch and radio module. Your customer for this project is the U.S. Army, Ground Forces and Special Operations. As the project manager for your team, you will be submitting to your manager a project management report.
Instructions
As the Project Manager, your manager has asked you to prepare a report on unplanned events that have occurred. You have been asked to present this report to a group of managers, and should discuss your course of action for two unplanned events (below) that have occurred for SuperPacks.
You will need to analyze the impact of these events in your project management report as a presentation; this can be PowerPoint, Prezi, or any presentation tool. Make sure you address the following questions in your presentation as you will be giving it to the management team.
Discuss your analysis on the following events:
1. It is discovered the refrigerated module is too large for the designed refrigerated backpack pouch. What is your course of action?
2. The subcontractor assigned to build the radio module for the backpack has shut down. What is your course of action?
3. Discuss four areas affected by these unexpected events. Three of the areas of the project affected by the events should include changes to budget, human capital, and impact to schedule. Identify one additional area affected by these events.
|
Explain the clean water act
: Clean Water Act. The Anacostia River, which flows through Washington, D.C., is one of the ten most polluted rivers in the country.
|
|
Derive a formula that relates pressure
: Use the ideal gas law equation and derive a formula that relates pressure and number of moles of gas at constant temperature and volume.
|
|
What does the nlea provide
: What does the NLEA provide? The NLEA sets out different requirements for products specifically intended for children under the age of four.
|
|
Discuss the way to trim the administrative costs
: Can you think of any way to trim the administrative costs associated with the clean-up of contaminated sites?
|
|
Evaluate the concepts of work breakdown structure
: Evaluate the concepts of work breakdown structure, coding, forecasting, and scheduling as project control functions.
|
|
Empirical formula for compound
: An oxide of iron is found to be 77.75% iron by mass. Determine the empirical formula for this compound and name it.
|
|
How might the given different laws affect a business
: How might these different laws affect a business? Is it fair that residents of one state have more protection than residents of another?
|
|
Identify the type of termination
: Discuss how you would successfully close out this project, such as verifying project scope, contracts, administration, etc.
|
|
Find maximum length of time saldona allowed to take leave
: What is the maximum length of time Saldona would have been allowed to take leave to care for his injured spouse?
|