Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A proposed earthen dam will contain 5,000,000 cubic meters of earth. Soil to be taken from a borrow pit will be compacted to a void ratio of 0.78. The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.
The rigid bar abcd is supported by a pin at B and restrained by identical steel bars at C and D, each of area 250mm 2 . if the temperature is increased by 8 0 C, find out the force P that will cause the bar at c to be stress-free.
Describe the crystalline or atomic structure of the following minerals: 1) Brucite 2) Gibbsite 3) Bentonite 4) Illite
The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.
Derive an equation that allows you to compute the diameter of the drain hole for a desired steady water height in the tank for the design condition inflow and pumping rates.
Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.
Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.
Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.
The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay
Toxic and Hazardous waste: how are they treated, safety measures, regulations in USA about hazardous waste.
Using the USLE, estimate the annual erosion from a 100 ha. forested watershed assuming the following: R =112 tonnes/ha/year. The forest is in fair condition with 40% cover; Average slope is 3%; The soils are clay loam in hydrologic group C.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd