Estimate the weight of concrete in four-lane highway segment

Assignment Help Civil Engineering
Reference no: EM13312739

Estimate the weight of concrete in a four-lane highway segment that begins as a 3% grade climb from 1000 feet altitude to 4000 feet and then a 6% downgrade to 2500 feet

Reference no: EM13312739

Questions Cloud

What is the normal force between the piston and cylinder : When rebuilding her car's engine, a physics major must exert 450 N of force to insert a dry steel piston into a steel cylinder at a constant velocity. What is the normal force between the piston and cylinder
Determine the total flow if the system head loss is 60 m : If D1 = 60 cm, D2, = 40 cm, D3 = 54 cm, L1 = 400 m, L2 = 450 m, and L3 = 750 m. Assume f = 0.0125 (3 riveted steel pipes). Determine the total flow if the system head loss is 60 m.
Explain how many grams of nahco3 : A solution is 2.25% by weight NaHCO3. How many grams of NaHCO3 are in 250.0 g of solution
Both relational and multidimensional databases : Both relational and multidimensional databases provide information needed to support management decision making. Which one would you query first as you pull together information to support a semi-structured decision. Why?
Estimate the weight of concrete in four-lane highway segment : Estimate the weight of concrete in a four-lane highway segment that begins as a 3% grade climb from 1000 feet altitude to 4000 feet and then a 6% downgrade to 2500 feet
Find the rms potential difference output : An ac generator has a maximum potential difference output of 155V. find the rms potential difference output
What is the rms current in the speaker : An audio amplifier provides an alternating rms potential difference of 15.0V. A loudspeaker connected to the amplifier has a resistance of 10.4 ohm. what is the rms current in the speaker
Explain what happens if the flow of solvent through a column : What happens if the flow of solvent through a column is too fast? What happens if the rate of flow is too low or if the flow is stopped for a period of time (by closing the stopcock?)
Determine the expected drawdown in the pumping well : The drawdown in another observation well 60 m from the pumping well is 1.1 m. Calculate (a) the hydraulic conductivity of the aquifer, (b) the expected drawdown in the pumping well,

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to approximate the number of the 120 intervals

At a specified point on a highway, vehicles are known to arrive according to a poisson process. Vehicles are counted in 20 second intervals, and vehicle counts are taken in 120 of these time intervals.

  Power developed by the force for a block

The block has a mass of 150 kg and rests on a surface for which the coefficients of static and kinetic friction are 0.5 and 0.4, respectively. If a force F = (60t^2) N, where t is in seconds, is applied to the cable, determine the power developed ..

  Determine the constant angular deceleration

A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.

  Highway construction project

A soil sample was taken from a proposed cut area in a highway construction project and sent to a soils laboratory for a compaction test, using the Standard Proctor compaction procedure. Results of the test are as follows:

  Calculate the required plate area and the number of plates

An Electrostatic Precipitator must treat 500,000 acfm with 99% efficiency. Assuming an effective drift velocity of 0.4 ft/sec, calculate the required plate area in ft^2, and the number of plates if each is 20 ft tall by 10 ft long, and there are 4..

  Determine the factor of safety for the given design

There are three 18 mm diameter steel bolts that are attached to a plate. The plate can support up to a 110 KN load, and the ultimate shear stress is 360 MPa. Determine the factor of safety for the given design.

  Environmental impact regarding the construction of the dam

Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..

  Determine the maximum force that acted on the shell

A boad initially stationary at water,fires a shell in i direction,The shell's air speed =822 m/s.The shell was in the gu8n for .16s, and the force exerted on the shell decrease linearly fromthe initial force to zero over the firing interval.

  Determine e at some other lenth along the beam at ends

If e is some value at midspan and e=0 at each end of the beam, and the cable within the beam has a parabolic profile. what is the expression I need to use to determine e at some other lenth along the beam

  Horizontal curve on a single-lane highway

A horizontal curve on a single-lane highway has its PC at station 124 + 10 and its PI at station 131 + 40. The curve has a superelvation of 0.06 ft/ft and is designed for 70 mi/h. What is the station of the PT?

  Determine the coefficient of kinetic friction

THE 2.5 MG VAN IS TRAVELLING WITH A SPEED OF 100KM/H WHEN THE BRAKES ARE APPLIED AND ALL 4 WHEELS LOCK. IF THE SPEED DECREASES TO 40KM/H IN 5S.

  Determine the speed with which b must walk toward a

Swimmer A immediately starts walking toward B at a speed of 2ft/s relative to the raft. Knowing that the raft weighs 300 lb, determine (a) the speed of the raft if B does not move, (b) the speed with which B must walk toward A

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd