1. Consider the following constraints from a two-variable linear program.

(1) X 0
(2) Y 0
(3) X + Y 50

If the optimal corner point lies at the intersection of constraints (2) and (3), what is the optimal solution (X, Y)?

2. Consider the following project schedule:

Activity Immediate Time ES EF LS LF
Predecessor
A ------ 4 0 4 6 10
B ------ 5 0 5 0 5
C A 3 4 7 10 13
D B 8 5 13 5 13
E B 2 5 7 16 18
F C,D 3 13 16 15 18
G C,D 7 13 20 13 20
H E,F 2 16 18 18 20

(a) Which activities are critical?
(b) Which activity has the most slack?

 

Reference no: EM13104423

Questions Cloud

Interpret the estimated tolerance intervals : Interpret the estimated tolerance intervals and the confidence interval in the context of the situation related to the exercise.
Explain the benefit of reverse auctioning : What do you mean by reverse auctioning and how did Ashok Leyland used it to their benefit? It is a request from the buyer to lower of actual prices of an item until it goes to lower price adequate for him/her to afford it.
How far from q1 should the third charge be placed : Two charges q1 = 6 µC, q2 = -49 µC, are L = 19 cm apart. A third charge is to be placed on the line between the two charges. How far from q1 should the third charge be placed so that the net electric force on the third charge is minimized?
Adopting a bonus system to increases production : Management of a company is considering adopting a bonus system to increases production. One suggestion is to pay a bonus on the highest 5 percent of production based on past experience.
Estimate the optimal solution : Consider the following project schedule, If the optimal corner point lies at the intersection of constraints (2) and (3), what is the optimal solution (X, Y)?
Significance level that the treatment means are equal : The following is sample information. Test the hypothesis at the .05 significance level that the treatment means are equal.
Find the rms input noise power level : assume that a receiver has first amplifier stage with a 5k ohms input resistance, a power gain of 300, an input audio signal of 20uV, and an operating temperature of 27 Celsius.
Explain strategic formulation process : What is the strategic formulation process, and what are the two primary processes in the strategic formulation process?
Confidence interval estimate : A random sample of the lifetime of 49 UltraIllum light bulbs has a mean of 3,960 hours and a standard deviation of 200 hours. Construct a 95% confidence interval estimate of the mean lifetime for all UltraIllum light bulbs.

Reviews

Write a Review

Operation Management Questions & Answers

  The manager of a regional warehouse must decide

The manager of a regional warehouse must decide on the number of loading docks to request for a new facility in order to minimize the sum of dock costs and driver-truck costs.

  Lead times for all items are a function of quality

Also there are 30 units of B and 20 units of D now on hand. lead times for all items are a function of quality

  Explain how it works and expected outcomes

You have been asked to fill-in for your boss this week. Your boss's assistant informs you that he had scheduled an engagement to teach a group of students at local University. explain how it works and expected outcomes.

  Describe responsibility of the accountant

When studying accounting form a managerial perspective, rather than as a practicing accountant, what is the responsibility of the accountant?

  Determine the schedule variance and cost variance

he software manager estimates a value completed of $279,000. Determine the schedule variance, cost variance, SPI, CPI, and time variance for the project.

  Describe the research design

Describe the research design. Analyze its strengths and weaknesses, Prepare the survey for analysis. Set up the code sheet for this study. How will this study be set up to be tabulated by a statistical analysis program like SPSS?

  Based on the calculation of estimated times

Based on the calculation of estimated times, what is the critical path andwhat is the estimated time of the critical path and what is the activity variance

  Calculate the overall proportion of tourists

Calculate the overall proportion of "tourists" (cars with out-of-state plates). b. Calculate the LCL and UCL for these data

  Operations reflect each of those management strategies

Identify MNEs whose operations reflect each of those management strategies. Then discuss the ways in which organized labor can possibly affect (or has affected) their pursuit of those strategies.

  For legal advice about my liability with respect

For legal advice about my liability with respect to the conduct of my agents in another state. I am trying to find information about relevant

  What is the best approach for an order taking system

What is the best approach for me to take in creating or implementing an order taking system and how do I deal with Privacy issues?

  Predict the out come of the risk schedule

Predict the out come of the risk schedule of the risk management process within this organization. Include examples(ie the incorrect assessment) to support your prediction.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd