Estimate the new speed required for the fan and the new sp

Assignment Help Civil Engineering
Reference no: EM13323587

A process in a plant is to be revised such that the air flow rate through a system will increase from 8000 cfm to 10,000 cfm. The existing fan runs at 1600rpm and provides 6.0 in. H2O SP. Estimate the new speed required for this fan and the new SP (static pressure).

Reference no: EM13323587

Questions Cloud

Find the gravitational force between the sun and the earth : Calculate the gravitational force between the Sun and the Earth. Use the following numbers. G = 6.67 x 10-11 m3/kg/s2, Mass of the Sun (M_sun) = 2.0 x 1030 kg
Create the following symbolic equations : Create the following symbolic equations.
Determine the reaction at a and b by a pin : Three loads are applied to a beam. the beam is supported by a roller at A and by a pin at B. neglecting the weight of the beam, determine the reaction at A and B when P=15kips.
What is the initial thermal energy of each : 2.0 g of helium at an initial temperature of 300 K interacts thermally with 8.0 g of oxygen at an initial temperature of 600K. What is the initial thermal energy of each
Estimate the new speed required for the fan and the new sp : A process in a plant is to be revised such that the air flow rate through a system will increase from 8000 cfm to 10,000 cfm. The existing fan runs at 1600rpm and provides 6.0 in. H2O SP.
Explain charge balance equation for a solution : Write the mass balance equation and charge balance equation for a solution that is 0.1 M FeCl3 and 0.2 M FeCl2
Calculate the mass emissions rate of no2 in kg per day : Assuming that the average stack gas velocity is 10.0 m/s and stack is circular with a 3.0 meter diameter, calculate the mass emissions rate of NO2 in kg/day.
Write a machine-language program to output : Write a machine-language program to output the four characters "Frog" on the output device.Write it in a form at suitable for the loader.
What is the maximum number of instructions : What is the maximum number of instructions you can expect to be able to use in the program that processes the data? Keep in mind that your applications program must share memory with the operating system and with your data.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate change in diameter and axial stress in each bar

The bottom bar is made up of an aluminum bar and a steel bar, each 10 in. long placed in the parallel configuration at 70 F. That is also heated to 300 F.

  What is capacity of pump required to supply max discharge

What is the capacity of the pump required to supply maximum required discharge to the model, in CFS The length of time the model must be operated to check the equivalent of 36 hours of operation for the prototype operation, in decimal format hours..

  What proportion of the true stress is the applied stress

A 10cm long cylindrical rod of steel is elongated to become 12.1cm long by the application of a force of 10kN. 1- What is the ration of initial diameter to final diameter, assuming no net volume change

  What is the mass of the earth in pound-mass and kilograms

The Earth may be considered as a sphere whose diameter is 8000 mi. and whose density is roughly approximated to be 6560 kg/m^3. What is the mass of the Earth in pound-mass and kilograms

  Estimate steady-state radon concentration in the crawl space

The house has a 1 m high dirt-floored crawl space. The emission rate of radon into the crawl space is reported to be 0.6 pCi/m2s. An exhaust system was added to provide 1 air exchange per hour (ACH) in the crawl space. The outdoor concentration of..

  Determine the corresponding unit hydrograph for channel

A 2.5 hr long uniform rainfall resulted in runoff hydrograph that has the shape of an equilateral triangle. The base of the triangle is 64 hr; the peak flow is 535 cfs; the drainage area is 5.7 mi^2.

  Determine the temporary hardness and permanent hardness

A well water has the following mineral contents in mg/L: Na+=20; K+=35; Ca+2 =15; Mg+2 =10; Sr=0.5; Cl- =40; HCO3- =65; CO3-2=5; SO4-2=15; and NO3=10.

  Plot transition from tangent to full superelevated section

The superelevation rate is 0.084. Prepare a plot showing the ordinates required for the transition from the tangent section to the full superelevated section, assuming that the pavement width is 7.3 m wide. Make any necessary assumptions.

  Find how much should the company be willing to spend

If the systems will reduce insurance claims by $100,000 two years from now, how much should the company be willing to spend now, it is uses an interest rat of 12% per year

  Determine final temperature of helium in quasistatic process

7 g helium at 50 kPa and 200 K (ideal gas, M = 4, k = 5/3) are compressed polytropically in a quasistatic process with pv1.8 to 600 kPa. find the final temperature of helium. find the work and heat interactions

  State the appropriate null and alternate hypotheses

The installation of a radon abatement device is recommended in any home where the mean radon concentration is 4.0 picocuries per liter (pCi/L) or more, because it is thought that longterm exposure to sufficiently high doses of radon can increase t..

  Calculate the apparent porosities if the matrix is quartz

The dry weight of a core is 28.20 gm. When saturated with a brine having a density of 1.15 gm/cc, the weight increases to 31.50 gm. Calculate the apparent porosities if the matrix is 1) quartz or 2) calcite.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd