Estimate the forward libor interest rate

Assignment Help Civil Engineering
Reference no: EM131404149

The three-month Eurodollar futures price for a contract maturing in six years is quoted as 95.20. The standard deviation of the change in the short-term interest rate in one year is 1.1%. Estimate the forward LIBOR interest rate for the period between 6.00 and 6.25 years in the future.

Reference no: EM131404149

Questions Cloud

Explain what is meant by a perfect hedge : Explain what is meant by a perfect hedge. Does a perfect hedge always lead to a better outcome than an imperfect hedge? Explain your answer.
Calculate the quoted futures price for the contract : The term structure is flat, and the rate of interest wit semiannual compounding is 12% per annum. The conversion factor for the bond is 1.5. The current quoted bond price is $110. Calculate the quoted futures price for the contract.
In what sense might this statement be true : Some people have claimed that "Science has become the religion of the twentieth and early twenty first centuries." At first glance this may seem a contradiction, as for centuries science and religion have been cast as polar opposites. In what sens..
What arbitrage opportunities are open to the bank : ,The Eurodollar futures price for a contract maturing in 91 days is quoted as 89.5. What arbitrage opportunities are open to the bank?
Estimate the forward libor interest rate : The standard deviation of the change in the short-term interest rate in one year is 1.1%. Estimate the forward LIBOR interest rate for the period between 6.00 and 6.25 years in the future.
Develop a lesson plan for a small group of learners : Develop a lesson plan for a small group of learners based on the chosen theme that focuses on phonics and phonemic awareness
Show that both portfolios have the same duration : Portfolio A consists of a one-year zero-coupon bond with a face value of $2,000 and a 10-year zero-coupon bond with a face value of $6,000. Portfolio B consists of a 5.95-year discount bond with a face value of $5,000. The current yield on all bon..
On what percentage of the days will the mine be operational : A mining company finds that daily lost-work injuries average 1.2. If the local union contract has a clause requiring that the mine be shut down as soon as three workers incur lost-work injuries, on what percentage of the days will the mine be ope..
Estimate the price and yield of a two-year bond : Estimate the price and yield of a two-year bond providing a semiannual coupon of 7% per annum.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Specify the hydraulic retention time for a pfr designed

In each experimental run, the concen tration of free available chlorine was varied and the time required to kill 99% of the organisms was determined. The results showed that a CT value of 200 min mg/L was sufficient to achieve a 2-log removal.

  Determine the required power input to thermoelectric cooler

A thermoelectric cooler has a COP of 0.15 and removes heat from a refrigerated space at a rate of 180 W. Determine the required power input to the thermoelectric cooler, in W.

  Determine the speed of each disk after the collision and the

Three cylinders from the same mix were tested for strenght.  Cylinders A and B were cast in 4x8 molds while cylinder C was cast in a 6x12 mold.  The total loads were as follows; cylinder A= 65,200 lbs.,  cylinder B= 68,550 lbs., cylinder C= 151,190 l..

  How large a sample must we take in order to be confident

how large a sample must we take in order to be a) 95% b) 90% c) 99 d) 99.73% confident that the error in the estimated mean lifetime will not exceed 20 hours.

  Compute the required layout distance if the temperature

A distance of 72.55 ft is recorded using a steel tape weighing 0.016 lb per foot. The tapes is supported only at the ends with a tension of 15 lb. Find the distance corrected for sag.

  What must be the slope of channel assuming chezy constant

An open channel has a vee shaped cross section with sides inclined at an angle of 60o to the vertical. If the rate of flow is 80 dm^3 s^-1 when the depth at the centre is 0.25 m, what must be the slope of the channel assuming Chezy's constant is 45..

  Calculate the work and heat transfer for the process

Write a program to solve the general case of Problem 6.111, in which the initial state and the expansion ratio are input variables.

  What is line of balance scheduling technique

What is line of balance scheduling technique in project management

  Determine the corresponding unit hydrograph for channel

A 2.5 hr long uniform rainfall resulted in runoff hydrograph that has the shape of an equilateral triangle. The base of the triangle is 64 hr; the peak flow is 535 cfs; the drainage area is 5.7 mi^2.

  Describes the candidates approach to solving a major issue

Write an opening statement that describes the candidate's approach to solving a major issue in education: the rising cost of college.

  How do you determine the proportions of aggregates

Plotted property surveys usually show the direction of property lines as bearings and not azimuths. True or false give reason to answer?

  Determine what is the thermal stress generated in the rod

The ¼" thick 6061?T6 aluminum bar is subjected to a tensile force of P = 5 kips. b = 4"; c = 1.5"; d = 2.5"; and the fillet radii are 1". a) Determine the maximum stress in the bar. b) What is the lateral strain in the 1.5" wide section

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd