Estimate the expected number of trip ends at the factory

Assignment Help Civil Engineering
Reference no: EM13297680

An automobile company is planning to build a 1.8 million square foot factory in Auburn. Estimate the expected number of trip ends at the factory on an average weekday.

Reference no: EM13297680

Questions Cloud

What is pexi cost of dollar-denominated equity : U.S. corporate tax rate = 30% German corporate tax rate = 40% What is Pexi's cost of dollar-denominated equity? a. 12.0%. b. 11.2%. c. 10.0%. d. 7.2%.
Determine what is the euac for a 10-year period : Zwango Plus Manufacturing experts that fixed costs of keeping its Zephyr Hills Plant operating will be $1.4M this year. If the fixed costs increase by $100,000 each year, what is the EUAC for a 10-year period Assume the interest rate is 12%.
What is health-disease and physically-mentally : what is health? What is disease? Physically, Mentally, Emotionally. Spiritually
What is the required risk-adjusted return on the project : The required investment outlay on the project is $4500. What is the required risk-adjusted return on the project? Should the project be purchased?
Estimate the expected number of trip ends at the factory : An automobile company is planning to build a 1.8 million square foot factory in Auburn. Estimate the expected number of trip ends at the factory on an average weekday.
Why is rebalancing a portfolio important : 1. Under what circumstances would a balanced mutual fund be the best option for investment? 2. What factors should you keep in mind when purchasing a stock fund or individual stocks? 3. Why is rebalancing a portfolio important?
What was the dealer gain or loss on the change in rates : The FX rate for the yen was 142 yen per dollar at the time of purchase, but then rose to 171.8 yen by the time payment was made. What was the dealer's gain or loss on the change in rates?
What is the total time spent in the system by all vehicles : Two toll booths are open and each can process arrivals (collect tolls) at a mean rate of 12 seconds per vehicle ( the processing time is also exponentially distributed). What is the total time spent in the system by all vehicles in a 1 hour period
Function of the financial system : Discuss the importance of banks for the flow-of-funds function of the financial system.

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Create a matlab program and flowchart

Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..

  Elastic modulus of steel

Given: elastic modulus of steel is 200 GPa, yield and ultimate tensile strength of steel are 600 and 750 MPa, respectively.

  List five soil and water management strategies

List five soil and water management strategies appropriate for agricultural use of ultisols. 100-150 word limit.

  The development of complex algorithms that can mine mounds

The development of complex algorithms that can mine mounds of data that have been collected from people and digital devices have led to the adoption of data mining by most businesses as a means of understanding their customers better than before

  What will be the force in newtons required

A lunar module weights 1500 kg on earth where g = 9.75 mps2. On the surface of the moon where g = 1.70 mps2, what will be the force in Newtons required to accelerate the module at 10 mps2?

  What is the corresponding horizontal distance

A runs slope a distance of 156.777 m from one point to another point at a rate of +1.5%. What is the corresponding horizontal distance between the points?

  Environmental soil cleaning company

How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.

  Calculate cracking moment for an unreinforced concrete beam

calculate the cracking moment (resisting moment) for an unreinforcedconcrete beam that is 10 in. wide, 16 in. high. assume normal weight concrete with 3000 psi = f prime sub c. use the internal couple method and check with the flexure formula.

  Determine what is the stationing of the pt

A crest vertical curve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72

  What is the factor of safety against sliding

a concrete dam retaining water has a specific weight of concrete of 23.5kn/m3, what is the factor of safety against sliding & overturning and pressure intensity on the base if coefficient of friction is 0.45.

  What is the maximum height

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  Factors of safety against sliding and against overturning

Determine the factors of safety against sliding and against overturning, and also the soil pressure at the heel and toe. Assume hydrostatic uplift varies uniformly from full hydrostatic head at the heel of the dam to zero at the toe. consider 1m l..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd