Estimate the demensions of the biofilter needed to treat

Assignment Help Civil Engineering
Reference no: EM13326170

It has been reported that a peat biofilter treating styrene had a maximum elimination capacity of 100 g/m^3-hr,and a critical load of between 60-75 g/m^3-hr. Further investigation reveals that a 97% efficiency was acheived at a load 40 g/m^3-hr. Assume that tomeet a local odor ordinance you must design for at least a 90% removal efficiency. Use this information to estimate the demensions of the biofilter needed to treat 10,000 m^3/hr of air (at 30 C and 1 atm) containing 200 ppm styrene being emitted from a boat- manufacturing plant. Assume the bed must be at least 1 meter deep, and that the surface loading cannot exceed 1.5m/min.

Reference no: EM13326170

Questions Cloud

What is anti-trust regulation : What is anti-trust regulation? Using examples discuss why consumer protection laws and anti trust laws are an important CSR issue
Calculate the mass of the ball : Using a ball that has unknown mass m. You plot your data in the form of f2 versus M/L, with f in rev/s,M in kg, and L in m. calculate the mass m of the ball
Which of these is most suitable for a biofilter and why : Five organic compounds (A through E) were tested for suitability for biofiltration control. Their retardation ratios (in order) were 5, 8, 13, 21 and 34.
Calculate the potential difference across each capacitor : Two capacitors are connected parallel to each other. Let C1= 3.50?F ,C2 = 5.50?F be their capacitances, Calculate the potential difference across each capacitor
Estimate the demensions of the biofilter needed to treat : Use this information to estimate the demensions of the biofilter needed to treat 10,000 m^3/hr of air (at 30 C and 1 atm) containing 200 ppm styrene being emitted from a boat- manufacturing plant.
What voltage was used to accelerate it : If an electron travels 0.250 m from an electron gun to a TV screen in 32.0 ns, what voltage was used to accelerate it
Estimate the velocity with which would contact the ground : estimate the velocity with which you would contact the ground if you jumped from an airplane at an altitude of 500ft and a) air resistance is negligible, b) air resistance is important, but you forgot your parachute
Determine your average speed for the entire trip : You travel from "point" Columbia to St. Louis in a car moving at a constant speed of 60 km/h. What is your average speed for the entire trip
Consultancy report to anthonys orchard : Review the readings and media for this unit, including the Anthony's Orchard case study media and familiarise yourself with the Anthony's Orchard company and its current situation; this can be done by exploring each of the tabs across the top of th..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Presedimentation-uspended solids concentration of raw revers

Presedimentation can reduce the suspended solids concentration of raw river water from 500 mg/L to 200 mg/L. How many pounds of dry solids does this represent per million gallons?

  What would be reading on barometer containing benzene

What would be the reading on a barometer containing Benzene at 20 degrees Celsius at a time when the atmospheric pressure was equivalent to 12.3 m of water

  What was the difference in elevation between the two points

A rod was held on point B and the telescope is inclined so that the horizontal cross line of the transit intersects the rod at the 5.2 ft mark. If the reading on the vertical limb of the transit was +25° 19',

  How many cubic yards of aggregate must be ordered

how many cubic yards of aggregate must be ordered for a road base 16 inches thick and 2000 feet long with a top width of 30 ft, if the side slopes are one on one, or 45 degree

  Calculate the plume centerline temperature at 6 m height

A pump in a large industrial hall containing 30 liters gasoline breaks down, causing the gasoline to spill into a 3 m2 sump surrounding the pump. The liquid pool is ignited by sparks. Assume the combustion to be 70% effective and the heat loss due..

  Determine the post construction vertical stress imposed

Determine the preconstruction and post construction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)

  Explain how transformation affects drawing of scatterplot

a. Use algebra and linearity of the expectation operator to find the answer. b. Explain how the transformation affects the drawing of the scatterplot we used to develop our understanding of covariance, and therefore why the answer to part a. shoul..

  Determine what is the gage pressure in chamber a

Two chambers, A and B both have manometers with the same fluid with specific gravity 1.4. When h(sub a) = 6 cm and h(sub b) = 4 cm, what is the gage pressure in chamber A

  Find cable forces f-q and p is directed along the z-axis

The vertical post is secured by three cables. The cables are pre-tensioned so that the resultant of the cable forces F, Q, and P is directed along the z-axis. If F =120lb, find P and Q.

  Calculate what ground distance will be measured

What ground distance will be measured if grid distance is 2158m and Orthometric height = 850m, Scale factor Sf = 0.9999943, Geoidal separation N = 27m, Ra = 6371km

  At what depth will 400 cfs flow uniformly in an earth lined

At what depth will 400 cfs flow uniformly in an earth lined (n = 0.025) trapezoidal canal of base width 15 ft having side slopes 1 on 3 if the canal is laid on a slope of 1 in 10,000.

  Find number of completely mixed chlorine contact chambers

Determine the number of completely mixed chlorine contact chambers each having a detention time of 30 min that would be required in a series arrangement to reduce the bacterial count of a treated effluent form 10^6 to 14.5 organisms/mL

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd