Emergency Equipment

Using CostWorks, calculate the cost of an emergency diesel generator for a building in Providence, RI, where the total electrical system is 5,000 kW and 20 percent of the system is on the emergency circuit.

Source: Modified from the textbook, Mubarak, S. (2012). How to estimate with RSMeans data: Basic skills for building construction (4th ed.). Hoboken, NJ: John Wiley.

Submission Requirements:

Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of the diesel generator.

Reference no: EM131018142

Questions Cloud

What conclude from information about income effect : Daniel was earning $65/hour and working 45 hours/week. Then Daniel's wage rose to $75/hour, and as a result, he now works 40 hours/week. What can we conclude from this information about the income effect and the substitution effect of a wage chang..
Write paper about relocation portion of termination : Write a two page paper about the "Relocation" portion of the Termination & Relocation policy - Briefly describe the mechanics, destinations, and results of Relocation
Estimate the bare cost of steel doors : Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of steel doors.
Calculate the consumer and producer surplus : Calculate equilibrium price, quantity, consumer surplus and domestic producer surplus. Now imagine this country opens to free trade and the world price of steel is $500 per ton. Under free trade, calculate the consumer and (domestic) producer surp..
Estimate the bare cost of the diesel generator : Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of the diesel generator.
Estimate the cost of the structural fill : Submit the CostWorks format, including all the data and calculations used to estimate the cost of the structural fill.
What will happen to the yield on 10 year treasury bonds : What interest rate would the bank have to charge to earn an expected rate of return on its loan equal to the T-bill rate - what would this indicate about investors expectations of future short term interest rates?
Estimate the total volume in thousand board feet of board : For a location in Oshkosh, WI, estimate the total volume, in thousand board feet (MBF), for 100 pieces of 2" x 8", 16-feet-long board by using CostWorks.
What is the anticipated price of eggs : Remember to show all of your work. Also remember that calculators are not permitted on exams, so you should try these by hand. Egg economists forecast that egg prices will rise 20% from 2012 to 2014. What is the anticipated price of eggs in 2014

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the torque required to rotate the cylinder

A 25-mm-diameter shaft .5 m long is pulled through a cylindrical bearing. The lubricant that fills the 0.3-mm gap between the shaft and bearing is an oil having a kinematic viscosity of 8.0 × 10-4 m2/s and a specific gravity of 0.91.

  Determine what is the specific yield of the aquifer material

The area is about 100,000 ha, the ground water pumping about 500 million m3 per year, and the water table drop about 3 m per year. Assuming no replenishment, what is the specific yield of the aquifer material

  What is the probability that among 10 automobile accidents

Assuming that 50% of the automobile accidents are due to a speed violation. a) What is the probability that among 10 automobile accidents at least 6 will be due mainly to a speed violation?

  A symmetric compound channel in over bank flow has a main

a symmetric compound channel in over bank flow has a main channel with a bottom width of 30 m side slopes of 11 and a

  How many pounds of ferric chloride per million gallons are

A ferric chloride dosage of 40 mg/l and an equivalent dosage of lime are used to coagulate a water.

  Determine the speed of the motorcyclist at the instant

While traveling around the curved path, the motorcyclist increases speed by 1.25ft/s^2 . Part A - Finding the time interval for the motorcyclist to reach a given acceleration If the motorcyclist starts from rest

  Find the value of the kinetic energy correction coefficient

assuming that the velocity variation within the main channel and the floodplain subsections is much smaller than the change in mean velocities between subsections, find the value of the kinetic energy correction coefficient.

  Find the principal moments of inertia and the principal axes

find the inertia tensor about the origin for a mass of uniform density=1,inside the part of the unit sphere where x>0,y>0,and find the principal moments of inertia and the principal axes.

  Determine the minimum necessary clearance height of overpass

The sag curve has a 70 mph design speed and G1 = -6% G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI.

  Determine what is the definition of critical state

what is the definition of critical state. explain at which stage a critical state may be approached in a drained triaxial text on a overconsolidated clay using stress path and strain-strain plot.

  What is the change in internal energy of the system

What is the change in internal energy of the system? Assume the displacement work in a (fully resisted) constant pressure process is given by (*sub 12 means from stage 1 to 2) Wsub12=p(Vsub2-Vsub1).

  Calculate the inner diameter if you are designing for a max

Assume 0.1 kg of air initially at 200 kPa and 300 K undergoes an isothermal compression process to a volume of 0.02 m3. Find the work done in the process and the final pressure. Sketch the process on a P-V diagram.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd