Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Given the following data for a vertical curve of a road; G1=-2.5%, G2=+5.5% and station of PVI=250+50.At station 252+50, the vertical curve must intersect an existing road at elevation 48.48ft. the elevation on the tangent section at station 256+50 is 67.55. What is the length of the vertical curve? and what is the elevation of the road at station 244+50?
Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.
How appropriate might a just in time inventory system be for a product such as roller skates?
If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for: a) the car with the base engine? b) car with the modified engine? Assume the car is on good dry pavement.
For the data given below, derive the 2-hr unit hydrograph for a watershed having a drainagearea of 216 km^2, assuming a constant baseflow of 20 m^3/s.
Determine the projected component of the force fac along the axis of strut ao. Express the result as a cartesian vector.
A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long.
What difference does the tightening of bolt in the friction grip joint make to the load at first slip and the failure load.
A 45 kg machine is placed at the end of a 1.6 m long cantilever beam of elastic modulus 200 x 109 N/m and cross-sectional moment of inertia 1.6 x 10-5 m4.
Engineering ethics concepts and cases
My question is regarding UVA levels in raw and treated drinking water with regard to TOC and DOC removal. Is there a jar test procedure that incorporates the UVA values of the various stages of treatment and is there a document you could refer me ..
The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.
A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11-ft lanes, a 5-ft right-side shoulder, interchange spacing of one every 10 miles, and a 60-mi/h base free-flow speed.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd