Reference no: EM132419002
EEE470 Protection Project Assignment
Problem and Report - Enclosed as Figure 1 is a diagram of an Arizona looped 230 kV transmission system which is typical of a system serving a large city. There is remote generation whose power is input to the loop over 2 - 345 kV lines. The voltage is transformed from 345 kV to 230 kV by 3-phase transformer banks T3 and T4. Transformer T1 and T2 step the voltage up at the remote generating site. Figure 2 is a single line diagram of the 230 kV and 345 kV systems, including the series impedance. Note that the data is in per unit on a 100 MVA base, 230 kV and 345 kV bases. The generator and transformer data is given in Section 2.
The Project is divided into 3 parts as follows:
1. Build the above system using PowerWorld
Build a simulation of the above system using PowerWorld.
2. Time-Over-Current Relay Scheme for a 69 kV Radial System
Design a coordinated time-over-current relay scheme for the radial 69 kV system shown in Figure 3. This radial system is connected to bus 5 of the system shown in Figures 1 and 2. The 69 kV structure configuration and line data is shown in Figure 4. Assume the zero sequence impedance is three times the positive sequence impedance. For minimum fault current calculations assume that the line from bus 5 and bus 9 is out.
Include:
The necessary short circuit studies.
The breaker ratings for B11-B13.
The CT ratios associated with B11-B13.
The tap and time dial settings for CO-8 relays associated with B11-B13.
The basis for the selections in the form of a report.
3. Distance Relay Protection System
Design a distance (impedance) protection system to protect the 230 kV line between busses 5 and 9 and to provide remote backup protection for line from bus 5 to bus 6. The 230 kV lines have 954 KCM ACSR conductors. You will need both an impedance ground fault relay and an impedance phase relay. Use mho units.
Include:
Circuit breaker selection.
Instrument transformer selection and connections.
Relay selections and settings.
Validation of your settings for all fault types by calculating the apparent impedance at bus 9 from computer studies for faults at bus 5. Revise your initial settings, if required.
The basis for the selections in the form of an engineering report.
Pertinent computer studies.
Note - All Required information and figures are in attached file.
Attachment:- Protection Project Assignment File.rar
|
Determine the number of units adelps sold during fy 2018
: Use this information to determine the number of units Adelps sold during FY 2018. (Round answer to nearest whole number)
|
|
Determine for adelps company the fy 2018 cost of goods sold
: Adelps Company uses absorption costing. Determine for Adelps Company the FY 2018 Cost of Goods Sold. (Round & enter final answer to the nearest dollar)
|
|
Prepare journal entries of runner company
: On January 1, 2017, Runner Company pays $10 million for 40% of the outstanding common stock of a supplier called Jog, Inc. On December 1, 2017 Jog, Inc
|
|
Describing the 4ps of marketing and its importance
: Describing the 4Ps of marketing and its importance in company success and provide example from the business world to support your explanation.
|
|
EEE470 Protection Project Assignment
: EEE470 Protection Project Assignment - Build a simulation of the above system using PowerWorld. Design a distance (impedance) protection system
|
|
Discuss iron sports competitive advantage challenge
: Discuss Iron Sports competitive advantage challenge
|
|
ITECH3108 Dynamic Web Programming Assignment
: ITECH3108 Dynamic Web Programming Assignment Help and Solution, Pencil Radar Assessment help - Federation University - develop a dynamic web application.
|
|
About maestro assignment
: About Maestro Assignment help and solutions:- Develop the company's pricing and distribution strategy and Develop your public relations, sales promotion
|
|
Report on how public relations works in industry
: Report on how public relations works in industry-by folowing the steps of choosing industry, overview, websites review, purpose and CSR and finalize the report.
|