A very simple product A consists of a base B. and a casting C. The base consists of a plate (P) and three fasteners (F). There are currently 30 castings and 100 bases on hand. Final assembly takes one week. The casting has a lead time of three weeks. All other parts have one week lead times. There are no scheduled receipts. All components use the lot-for-lot technique. The master schedule requires 80 units of product A in week 5 and 120 units in week 8. Draw the product structure tree for this product and produce the MRP net requirement plans for product A and all its components & parts for the upcoming eight weeks.
As a CEO, you are trying to acquire a foreign firm. The size of your firm will be double and it will become the largest in your industry. What does your firm do and what does the foreign firm you are trying to acquire do?
What were the critical drivers of Starbucks success
Your current equipment is fully depreciated and can produce 2,000 units per year at but at a margin of only $4.00 per unit. Should you purchase new equipment illustrate under what conditions.
The retailer is not using an order quantity of 500 units. An analyst observes that savings could be realized by using the EOQ. The manager says to forget about mathematics, he has a way of reducing the order cost to only $25/ order.
A publisher sells books to Borders at $12 each. Borders prices the book to its customers at $24 and expects demand over the next two months to be normally distributed
Are the same principles involved in both these questions? Explain.
Discuss the importance of influence. How you would attempt to apply it to convince your team to work anextra day per week to earn time off later
Mathematical formulation of the model
Heather Adams, production manager for a Colorado exercise equipment, needs to schedule an order for 50 UltimatSteppers, which are to be shipped in week 8. Subscripts indicate quantity required for each parent.
You need to increase capacity of your manufacturing operation by adding new equipment. Two vendors have presented proposals.
Calculate the economic order quantity. Calculate the total annual cost. Determine the reorder point, It costs $8 to place an order for plant food.
Assure a reasonable reliability by conventional design. Set up a decision tree also evaluate expected total cost of both designs. Which design would you prefer.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd