Transportation Engineering Assignment - Major Project - Two Reports

Instructions:

Important: This project is not the one which can be done in few days. Only the group which works consistently and collaboratively right from week 1 will be able to put together a good report.

Students form a group consisting of up 4 members and then choose a subdivision of about 10 ha area for designing. The subdivision chosen must be vacant land which needs to be developed and must be located within Australia. Each group must prepare two reports as detailed below. The reports must give the unit coordinator an appreciation of the knowledge of the topic gained by the student teams, and the research and report writing competencies of the students. All students in the group must make an equal contribution as determined in team meetings. The mark awarded will be for the entire group (who have registered and are included in the cover sheet) and will be taken same for each individual student in the group. If a group member does not contribute equally to the preparation of the report his/ her name must be left out of the report. In such cases, the student whose name is not included in the report will receive zero mark. Once the report is submitted, no amendments to the members contribution or, inclusion or deletion of a particular member in the report will be accepted. It is the individual students responsibility to make sure that their name is included in the report. If the name of a group member is left out, it means that student did not contribute to the report. No further appeals or discussions will be entertained.

All students must enroll into a group in the first week of the session and start their project work right from the first week. At the latest, students must enroll into a group by 12.00 noon Friday, Week 4. Those who fail to enroll into a group by this date and time, will receive a zero (0) mark for their major project. Also, students are advised to choose their group members appropriately, which is the reason for allowing sufficient time to from their group of choice. After the above due date for forming the group, no changes to the group are allowed, even if the group is left with one member. If one or more members leave the group, the remaining members must carry-out the work. Unfortunately, under those circumstances the student(s) remained in the group have to carry-out all the tasks required by the project. It is solely individual student responsibility to join an appropriate group of his or her choice. Unit coordinator will not entertain any issues related to dysfunctional groups.

Report 1 - Project Report

Your mark for Report 1 will be awarded according to the criteria below under each of the project activities (also, refer to the marking criteria table).

1. Location and City Councils planning guidelines:

For the location of the site, you must include:

- Describe the location of the site (site must be located within Australia).

- Identify the local government (City Council) under which the site is located.

- Provide Google Earth map or any other map that identify the site

- Provide latitude and longitude details

For the City Council under which your selected subdivision would belong, you need to provide:

- Brief discussions on LEP and DCP objectives Guidelines or requirements for subdivision development

- Requirements on lot size, local and collector roads and open space requirements

2. Subdivision layout

Under this section, you must include:

- Capture the area using Google Earth and MX Road.

- Draw contours of the site

- Develop the layout with residential, commercial and institutional lots as per the relevant City Councils and other guidelines including the roads.

- Identify cul-de-sac, and local and collector roads, and state their widths.

- Draw all the roads using MX Road or Open Road and show carriage way widths and verges on either sides.

- List the size of each of the lots in a table.

- Lots must be identified on the map using lot numbers.

Draw the subdivision layout to the scale using Microstation or similar CAD program. Number of lots must satisfy developer expectations while complying with the city council guidelines.

3. Traffic volume calculations

Under this section you must include:

- Calculate traffic volume (AADT and hourly peak) for each of the roads

- Calculate design traffic in terms of HVAG, ESA, SAR5, SAR7 and SAR12. Step by step workings of all the calculations must be shown.

4. Written Communication

Mark under this criterion will be decided based on:

- Description of the process on which the group was formed.

- Minutes of the meeting.

- Contributions made from each member.

- Proper English expression, editing and layout.

- Harvard style referencing.

- Professionalism of the engineering report.

- Table of content and list of figures, tables, pictures, abbreviations and appendices (if nay).

- Appropriate numbering of tables, figures, headings and sub-headings.

- Demonstrate good writing skills in terms of presenting only the relevant information in a concise manner.

Rubric includes the kinds of feedback comments you would receive for different grades. Detailed rubric can be found under the assessment criteria and the same will be used while assessing the report. Your mark under each criterion will be determined by the task that is not completed under the lowest standard.

Report 2: Major Project Report

Your mark for Report 2 will be awarded according to the criteria given below under each of the project activities.

1. Pavement design

Must include the following information:

- Subdivision layout

- Tables giving lot numbers and sizes.

- Tables showing road names, AADT and the design traffic in terms of ESA, SAR5, SAR7 and SAR12.

- Design flexible pavement for each of the roads using CIRCLY; document each and every step of the design process.

- All the carriageways and T and cross junctions must be laid out on the drawing using MX Road.

- The carriageway must show the reserved road width for that road.

- All the design drawings must be presented as A3 sized PDF documents.

- Show all long sections on A3 sized PDF document for each of the roads with legible annotations.

- Show cross sections at 100 m intervals for each of the roads with legible annotations

- All long and cross sections must show both the ground and formation levels.

2. Design of intersections

Must include the following information:

- Summary table for each of the intersections, giving the peak hourly traffic flow rate for each of the road meeting at the intersection.

- Use SIDRA Intersections software to calculate the delay time for the intersection.

- Determine the type of the intersection considering level of service required at the intersection.

- Calculate the delay time with the new intersection and check for the LoS.

3. Stormwater drainage design.

Must include the following information:

- Identify the contributing total and sub-catchment areas.

- Identify the stormwater inlet points and the corresponding contributing areas.

- Calculate the amount of stormwater generated for a 1 in 10 year rainfall event.

- Determine the size of the network of stormwater channels required.

- Show the network of stormwater channels on the subdivision layout drawing using Microstation or other equivalent CAD drawing software.

4. Economic assessment

Estimate the overall cost of development of subdivision and the planned outlay of investment. The economic assessment must include:

- Draw mass haul diagram for all the roads and determine overhaul assuming 100 m free haul.

- Determine the bill of quantities of all the items.

- Get the unit prices from Rawlinson Handbook or any other reliable sources.

- Must quote the reference for each of the unit price chosen.

- Work out the planned outlay of the investment.

- Estimate the total present worth cost of the project using a discount rate of 5% and inflation rate of 3%.

Construction of the houses is not the responsibility of the developer, hence house construction must not be included as part of the economic assessment. Assume that the land can be purchased at $1 million per hectare.

5. Environmental assessment.

Must include the following information:

- Describe the current environmental setting in terms of physic-chemical, biological and socio-economic environment, and ecosystem.

- Identify significant environmental impacts.

- Evaluate the impact on the physico-chemical, biological and socioeconomic environment and ecosystem, and construct impact matrix which includes magnitude of impact and importance of impact.

- Construct a Leopold matrix between environmental items and project activities.

- Assign both the magnitude and importance values. Magnitude can vary from 0 to 10. Importance can vary from 0 to 10.

- Both the magnitude and importance values must be assigned to all the project activities, for example, surveying, land clearing, road construction, etc.

- Determine the overall impact score for each of the project activities and for the entire subdivision.

6. Project management and written communication

This marking under this criterion will be based on:

- Gantt charts - Provide two Gantt charts (one for the group work and one for the construction of the subdivision).

- Describe how the tasks are distributed and the group managed; include minutes of the meetings and other evidences.

- Proper English expression, editing and layout Harvard style referencing

- Professionalism of Engineering Report

- Table of content and list of figures and tables

- Appropriate numbering of tables, figures, headings and sub-heading

Marking criteria provided under the next section includes the kinds of feedback comments you would receive for different grades for Report 2. Your mark under each criterion will be determined by the task that is not completed under the lowest standard.

Attachment:- Assignment File.rar

Reference no: EM131684731

Questions Cloud

How do the teams manage their team boundaries : Consider the list of common roles for team members which of these roles do you think you play in your own team or group? Why?
What are valid contents of a risk management plan : An organization that accepts credit card payments, would be expected to be compliant with which of the following laws or standards?
Discuss the whiteboard to draw your food web : Describe a food web based on the interrelationships of the organisms identified in the excerpt. You may also use the whiteboard application
How do these support the principles of p2 and sustainability : How do these support the principles of P2 and sustainability, What goals have the company set, and what is the time frame for completing these
Draw all the roads using mx road or open road : 300982 Transportation Engineering Assignment. Draw all the roads using MX Road or Open Road and show carriage way widths and verges on either sides
Discuss acorn production and gypsy moth population : Design a controlled experiment that tests the relationship between acorn production and gypsy moth population
What is happening right now in environmental science life : choose a topic about what is happening right now in Environmental Science Life. Can a tutor give me topic ideas of what should I talk about in class
Is canada more or less biologically diverse than russia : are not considered to be one of the 17 most biological diverse countries on the plant. Is Canada more or less biologically diverse than Russia
Describe two specific ways in which u.s. fisheries : Describe two specific ways in which U.S. fisheries exhibit lost opportunities

Reviews

len1684731

10/20/2017 3:12:23 AM

Submission: Both the reports must be submitted online via Turnitin links located on the units vUWS site before the due date and time. All submissions must include the groups assignment cover sheet, which is available on the vUWS site under the folder ”Assessments.” Format: Report 1: Max. 5000 words. Report 2: Max 10,000 words. The word count includes figures, tables, equations and relevant pictures, which are included as part of the main text. The word count excludes table of content; list of figures, tables, pictures, abbreviations and references; and appendices (if any). Length: 15,000 words equivalent for the entire group of 4 members. The report will include drawings, calculation sheets, tables and figures. Actual write-up can be about 25%.

len1684731

10/20/2017 3:12:14 AM

All the calculations are excellently presented. All the data used for design are properly referenced with in-text referencing. All the calculations are excellently presented. All the unit prices used are properly referenced with in-text referencing. All the information is presented with in text reference wherever possible. A good description is provided on how the impact magnitudes are assigned. Excellent report with a well -documented project management. Report is prepared as a proper Engineering report.

len1684731

10/20/2017 3:12:06 AM

All the relevant information excellently compiled together. All the data are properly referenced with in-text referencing. Excellent subdivision layout with all the information. All the data are properly referenced with in-text referencing. All the calculations are excellently presented. All the data are properly referenced with in-text referencing. Excellent report and is prepared as a proper Engineering report (with introduction and conclusions). All design data excellently compiled together. All the cross sections are accurately drawn with legible annotations. Excellent compilation of all the data and calculations. SIDRA outputs are properly presented.

len1684731

10/20/2017 3:11:58 AM

Resources required include: Read the instructions and reference materials of various software. Follow the online tutorials for Microstation/ MX/ Open Road. Access and understand all the lecture, tutorial, practical and reference learning materials. Access to relevant CAD software and required IT facilities for running the CAD software. Most SCEM computers at Kingswood campus would have the required software installed.

len1684731

10/20/2017 3:11:49 AM

Resources: Students are required to use Microstation, MX Road; Google Earth, SIDRA Intersections and CIRCLY design software to complete the project. The Project Reports must be completed in Microsoft Word. Only the Microsoft Word documents must be submitted to Turnitin. The report must include the outputs from the software. The outputs must be properly presented using tables, graphs and drawings with legible annotations. Some inputs and outputs screens may be included as graphical pictures.

Write a Review

Other Engineering Questions & Answers

  Discuss potential ergonomic problems

Write a brief description of the organisation you have selected, the type of business it is in, its size - Discuss FIVE potential ergonomic 'problems

  Calculate the relative frequency that you flip a head

Calculate the relative frequency that You flip a head and roll more than 4, You flip a head and roll a 2, You flip a tail and roll more than 4 and You flip a tail and roll a 2.

  Create a traffic intersection

create a traffic intersection using the Allen-Bradley plc and RSlogix software. Two traffic lights are used for North-South, one turn and one thru, and one light is used for East-West.

  What is the uniform deterministic arrival rate

what is the uniform deterministic arrival rate if the vehicle queue is cleared 35 minutes after vehicles begin to arrive?

  Question 1in view of growing number of deaths on the road

question 1in view of growing number of deaths on the road the police department plans to introduce more speeding

  Problems based on term channel in communication

Audience analysis should occur at what point in the creation of a message?

  What would be the minimum bridgetunnel separation

If so, what would be the minimum bridgetunnel separation distance (something higher than the current 1200 ft separation) needed to connect the elevations of the bridge and tunnel with 70 mi/h designspeed curves?

  Design a pv and storage system

Based on your design cost, you will make the life cycle analysis based on present worth factor and life cycle savings method, and make a reaction paper compared to the present water heating consumption/cost.

  Determine the total directional traffic volume

The highway is on rolling terrain with 12% large trucks and buses and 6% recreational vehicles, and the peak hour factor is 0.92. If 17% of all directional traffic occurs during the peak hour, determine the total directional traffic volume.

  Determine the unit area frequency response characteristic

Determine the unit area frequency response characteristic β on a 100-MVA base, (b) the steady-state increase in area frequency,

  Determine number of lanes required to provide at least los

Determine the number of lanes (both directions) required to provide at least LOS D using the 60th highest annual hourly volume

  What does the graph show you about the relative importance

What does the graph show you about the relative importance of the software qualities? Are there any cycles in the graph? What does a cycle imply?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd