Discuss the key stages in a construction project

Assignment Help Civil Engineering
Reference no: EM132325830

Construction Practice and Management

P1 Explain how the construction industry has developed and encompassed professionalism within its structures.

P2 Demonstrate the scope and linkage between head office and site office structure within a construction organisation.

P3 Identify the type of contractual work tendered by contractors

P4 Identify the different types of construction companies in the market.

P5 Explain the relationship between different construction organisations. (give example of at least 3)

P6 Identify, with examples, modern construction processes and sequences highlighting the way they respond to sustainability needs.

P7 Explain contract planning techniques used within micro and macro projects.

P8 Identify where BIM impacts upon operations and construction companies.

P9 Explain how health & safety has now become an integrated part of the construction process.

P10 Describe the government legislation which has benchmarked health & safety within construction.

P11 Discuss the role of collaboration and communication in ensuring safe working practices.

M1 Analyse how the construction industry has developed overall in terms employees and contracted work.

M2 Analyse the catalyst which connects construction companies, including contracts and tendering.

M3 Analyse how construction has developed in terms of innovation, designs, and within contracts for micro and macro projects, and the interrelationship with BIM.

M4 Demonstrate how the construction industry has benefited through changes in health safety legislation.

D1 Critically evaluate how construction companies have developed their structure and business ethos.

D2 Compare the main factors which differentiate between construction companies, contracts and tendering.

D3 Provide a detailed analysis of how the construction industry has evolved in terms of innovative construction methods and contracts.

D4 Evaluate the impact of health & safety legislation, how it has evolved the drivers for it, and its advantages or weaknesses within construction.

Assignment

1. Describe the construction industry with reference to company structures and other activities.

2. Explain different types of construction companies in the market and their relationships within the tendering process.

3. Discuss the key stages in a construction project, and how Building Information. Modelling informs the different stages.

4. Analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health It safety.

Scenario (Task 1.1 to 1.5)
You are the assistant construction manager in a consultant firm and your client has a new residential project at Kowloon East Road. The following information is required by client to develop an organisation for this project.

Task 1.1 (P1)
Explain how the construction industry has developed and encompassed professionalism within its structures.

Task 1.2 (P2)
Demonstrate the scope and linkage between head office and site office structure within a construction organisation.

Task 1.3 (P3)
Identify the type of contractual work tendered by contractors.

Task 1.4 (M1)
Analyse how the construction industry has developed overall in terms of company structures, it's employees and contracted work.

Task 1.5 (D1)
Critically evaluate how construction companies have developed their structure and business ethos.

Scenario (Task 2.1 to 2.4)
In the feasibility stage of the project, your client arranged a meeting with you on the next week to discuss the different types of construction company and their relationships within the tendering process. He has sent you a meeting agenda with the following discussion points for your preparation.

Task 2.1 (P4)
Identify the different types of construction companies in the market.

Task 2.2 (P5)
Explain the relationship between different construction organisations. (give example of at least 3)

Task 2.3(M2)
Analyse the catalyst which connects construction companies, including contracts and tendering.

Task 2.4 (D2)
Compare the main factors which differentiate between construction companies, contracts and tendering.

Scenario (Task 3.1 to 3.4)
You have recommended your client to use BIM (Building Information Modelling) in this project and you are preparing a presentation to explain the key stages in a construction project, and how Building Information Modelling informs the different stages.

Task 3.1 (P6)
Identify, with examples, modern construction processes and sequences used within today's industry, highlighting the way they respond to sustainability needs.

Task 3.2 (P7)
Explain contract planning techniques used within micro and macro projects.

Task 3.3 (P8)
Identify where BIM impacts upon operations and construction companies.

Task 3.4 (M3)
Analyse how construction has developed in terms of innovation, designs, and within contracts for micro and macro projects, and the interrelationship with BIM.

Task 3.5 (D3)
Provide a detailed analysis of how the construction industry has evolved in terms of innovative construction methods and contracts.

Scenario (Task 4.1 to 4.5)
The client concerns about the health and safety issue in the project. He requested you to analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health and safety.

Task 4.1 (P9)
Explain how health and safety has now become an integrated part of the construction process.

Task 4.2 (P10)
Describe the government legislation which has benchmarked health Et safety within construction.

Task 4.3 (P11)
Discuss the role of collaboration and communication in ensuring safe working practices.

Task 4.4 (M4)
Demonstrate how the construction industry has benefited through changes in health safety legislation.

Task 4.5 (D4)
Evaluate the impact of health Et safety legislation, how it has evolved the drivers for it, and its advantages or weaknesses within construction.

Reference no: EM132325830

Questions Cloud

Discusses the jobs characteristic model : Discusses the Jobs Characteristic Model (JCM). Discuss how you would implement this in your organization (or volunteer activity).
How the populist movement affected political developments : Using a minimum of 200 words explain how the populist movement affected political developments in the PNW in the late 19th century.
Compute variances using standard and actual costs : IG009 Accounting Tools and Measures Assignment, Walden University, USA. Compute variances using standard and actual costs
Describe two lessons you learn from the examples : Women Challenge their Audience. Essay. Lessons in Public Speaking: Two women of very different backgrounds and language skills gave effective speeches.
Discuss the key stages in a construction project : Construction Practice and Management - HND in Construction and the Built Environment - Coleman College - Describe the construction industry with reference
Define how would you respond to the speech : Adolph Hitler was a charismatic figure with remarkable oratory skills that he was able to use to unify the German people under his leadership by appealing.
How the implementation of a balanced scorecard would help : The CEO of Telum Ltd is concerned that the focus on financial measures could have an adverse long-term effect on the viability of the company.
Why did the renaissance start in italy : Why did the Renaissance start in Italy? Describe the role of the aristocratic courts of such powerful figures as the de Medicis and the papacy in engendering.
Discuss rock types formation and classification : N5E29 - Geotechnics & Soil Mechanics - HND in Construction and the Built Environment - Coleman College - Produce a proposal to address identified geotechnical

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd