Reference no: EM132157452
Question: Part 2: Capstone Project - Informational
This part of the assignment is not for grading this week. This part of the assignment is to contribute to the Capstone project and also to show the instructor that progress is being made on the Capstone project.
Continue using the template that was modified in Unit 1. Submit your Capstone project work to the Group Submission area. Include the word "DRAFT" in the document title. Your second draft will then be available to share with your team. The second draft will also be available for your instructor to review team progress.
Use the company profile and scenario found here as the subject of your Systems Implementation Plan.
Team Project
New Requirements
Designing a network involves data, voice, and power considerations. Creating a well-integrated social relationship platform involves interoperability with other technologies, like customer relationship management (CRM). Assume you are designing a network infrastructure for Verbania, Inc. The company requires an efficient network that carries data, Voice over Internet Protocol (VoIP), and Power over Ethernet (PoE). It also requires the effective use of a CRM system to pull customers' social media data for review and analysis to improve user experience and generate profits.
Capstone Project Activity - Unit 2
The project team must analyze the New Requirements. This section will specify what the company will need in the area of solution elements, such as networking, Voice Over Internet Protocol (VoIP), and Power over Ethernet (PoE). Specifically, this section will answer the following questions (at a minimum):
• Which type of network topology would you recommend for the corporate backbone and the wired and wireless connections? Why do you think this would be the best choice?
• Which type of cabling would you recommend? Why do you think this would be the best choice?
• How will the network infrastructure accommodate remote access?
• What solution would you propose to integrate the social media site with a CRM solution?
• What security considerations are involved?
Collaborate and work with the network specialist on the team. Be sure to capture and document the decisions made in the appropriate section of the Capstone project document.
Prepare 6-8 pages of content addressing the team's system analysis of requirements defined in Section One. Insert content into the template document under Section Two.
Define implementation issues for wireless networks
: Based on the topics covered to this point in the course, assess what you consider to be the two most challenging implementation issues for wireless networks.
|
What you consider to be the most challenging aspects
: Based on the topics covered to this point in the course, assess what you consider to be the two most challenging aspects about adopting and supporting standards
|
Identifying key success factors for the company
: There are a number of analytical tools to help you organize, analyze, and display your information in a convenient and easy to interpret form.
|
Explain why entrepreneurs are highly social by nature
: According to Byers, Kist, and Sutton's article titled "Characteristics of the Entrepreneur: Social Creatures.
|
Discuss effective use of a crm system
: Designing a network involves data, voice, and power considerations. Creating a well-integrated social relationship platform involves interoperability.
|
Confidence interval of the population
: Suppose that the standard deviation of the collected data from 250 alumni is $10k and the mean is $50k, please estimate the confidence
|
Assumption that the alternative hypothesis
: In a test of hypothesis, the sampling distribution of the test statistic is calculated under the assumption that the alternative hypothesis is true.
|
Create robust interaction and dialogue
: The Discussion Board (DB) is part of the core of online learning. Classroom discussion in an online environment requires the active participation of students.
|
Identify several best practices for manging the project
: Identify several best practices for manging the project while managing unexpected risks. Which tools would you use to help manage risks?
|