Different components of all types of earth fill dam

Assignment Help Civil Engineering
Reference no: EM131279716 , Length:

Assignment

There are many types of dams that are used for the purpose of water storing. Earth fill dams are artificial water barriers. They are constructed basically by compiling and compacting of various compositions of soil, sand, clay and/or rock. In Oman, this type of dams is widely used.

As geotechnical engineer, you are required to write a report presenting the following:

A. Different components of all types of earth fill dam.
B. The type of soil that should be used in each component and its geotechnical properties.
C. Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions.
D. the general compaction procedure which is followed in any earth dam project
E. The regulations and specifications that followed for compaction works for earth dam in Oman.
F. The experiments that are used to control the quality of the compaction works.

Contents of the report

1. Title page (template will be provided).

2. Marking sheet

3. Table of contents.

4. Chapter 1 Introduction
Here students should describe clearly:
a) The aim and the objectives of this report
b) The definition of earth filled dams and types.

5. Chapter 2 Components of earth filled dam
Here student should answer points A, B, and C of the assignment.

6. Chapter3: Compaction and its importance in earth filled dam projects
Here student should answer points 0, E, and F of the assignment.

7. Chapter4: Case Studies from Oman
Discussing an earth filled dam case which was constructed in Oman. The discussion should include points A, B, D, and E

8. References: CCE referencing style should be used.

Proper referencing should be done for the drawings, pictures and quotes, if it is taken from any other source. CCE referencing style should be followed here.

Reference no: EM131279716

Questions Cloud

What are contraction risk and extension risk : Why is an assumed prepayment speed necessary to project the cash flow of a mortgage pass through security?-  What is meant by prepayment risk for a residential mortgage-backed security?
Essay on a designer name eero saarinen and her womb chair : Write an essay about a designer name Eero saarinen and her womb chair. The essay will consist of tree paragraghs, each containing five sentences.
Who determines the amount of credit enhancement needed : Why is it necessary for a nonagency mortgage-backed security to have credit enhancement?- Who determines the amount of credit enhancement needed?
Importance of effective change leadership : Investigate the importance of effective change leadership in relation to an organization's adoption of social media initiatives. Next, suggest two (2) ethical issues that a CIO may encounter when implementing social media initiatives. Propose (1) ..
Different components of all types of earth fill dam : Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions.
Determine the maximum diameter allowed : Carbon dioxide at 20 °C and a pressure of 550 kPa (abs) flows in a pipe at a rate of 0.04 N/s. Determine the maximum diameter allowed if the flow is to be turbulent.
Why is balloon risk referred to as extension risk : What is the difference between a private label and subprime mortgage backed security? Be sure to mention how they differ in terms of credit enhancement.
Example of securities fraud : The Georgia State Board of Nursing Home Administrators is an administrative agency created by the Georgia legislature. One of the functions of an administrative agency is rule making. Each of the following is an example of securities fraud except:
What is the value of the wall shear stress : The pressure distribution measured along a straight, horizontal portion of a 50-mm-diameter pipe attached to a tank is shown in the table below. Approximately how long is the entrance length? In the fully developed portion of the flow, what is the..

Reviews

inf1279716

11/18/2016 4:39:12 AM

Please it would be great if the tutor will do the assignment as said by the latest msg from student please. 19449968_1IMG-20161117-WA0046.jpg From this assignment I want Chapter 1 question A & B. it should carry all the necessary and important points. We can assume 500 words for CH-1 Q And B

len1279716

11/17/2016 1:58:44 AM

3 Chapter3: Compaction and its importance in earth filled dam projects D. the general compaction procedure which is followed in any earth dam project (Point C above) 10 E. The regulations and specifications that followed for compaction works for earth dam in Oman. 10 F. The experiments that are used to control the quality of the compaction works. 10 4 Chapter4: Case Study from Oman Discussing an earth filled dam case which was constructed in Oman. The discussion should include points A, B, D, and E 10 Overall style and language of the paper: - Consistency of fonts, proper spacing, alignments, adherence to naming conventions, grammars and spelling, using CCE referencing style. 20

len1279716

11/17/2016 1:58:31 AM

1 Chapter 1 Introduction The aim and the objectives of this report 5 The definition of earth filled dams and types 5 2 Chapter 2 Components of earth filled dam A. Different components of all types of earth fill dam. 10 13. The type of soil that should be used in each component and its geotechnical properties 10 C. Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions. (Note: no credit will be given for disproportionate and badly drawn sketch) 10 I

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd