Develop the network diagram using the expected time

Assignment Help Supply Chain Management
Reference no: EM132882773

CEN4017-N Risk Management in Project - Teesside University

Question 1

The Pulsometer Pump Company makes concrete pumping equipment for the European market and is at present operating at near production capacity. The sales and marketing director of the company anticipates that the market for concrete pumps will increase by 15% during the next twelve months. The board must decide how to react to this change in demand. There are three strategies that are being considered
S1 Install new equipment to improve productivity with a new system of working
S2 Institute overtime and weekend working
S3 Continue to work at capacity and let rivals or new firms satisfy the increased demand

A decision matrix can be constructed to show information (all column show profits, in £000s).

 

 

Market Factors

Strategy

15%

Stable

-10%

S1

240

130

0

S2

210

150

70

S3

170

150

70

Use the Pay-off Matrix to make the decision and inform what decisions should the board take? The company board is satisfied with the pay-off procedure however they are not confident with your decision. The sales and marketing director of the company now decided that "we need the probabilities associated with the change in market demands". The probabilities are

 

Market Outcomes

Probability (in %)

15% Rise

0.6

Stable

0.3

10% fall

0.1

Calculate the Expected Monetary Value Analysis (EMV) for each strategy and use the decision tree to show the best option. The board is impressed with the decision method which has informed their decision making. They have assigned you to further investigation on the decision due to variability of returns and further measure of the degree of risk. You need support to do further investigation so that you can examine the sensitivity of decisions. A firm of consultants offers to survey the market for concrete pumps. This survey will lead to a revision of prior probabilities estimate of the likely market outcome. The survey will cost the company £5,000. The consultancy predictions records are shown below

 

 

 

Consultant's Prediction (in %)

Actual Market Outcome

Prior

Probabilities

Rise

Stable

Fall

Rise

0.6

0.7

0.2

0.1

Stable

0.3

0.2

0.6

0.2

Fall

0.1

0.1

0.2

0.7

Hint:The sum of getting a `Rise report` is given by the sum of the probabilities of getting a `Rise report` under each outcome multiplied respectively by the probability of getting that outcome.

Use the Bayes Theorem to revise the consultant`s prediction. Should you choose to pay for this additional information? Produce a revised Decision tree for the board to make a decision. You should discuss your decision on to use or not to use the consultant firm and each strategy.your decision on to use or not to use the consultant firm and each strategy.

Question 2:

Refer to the Gulf Golf Problem described in the Lecture sessions, suppose that management encounters each of the following situations:
a. The accounting department revises its estimate of the profit contribution for the deluxe bag to $18 per bag
b. A new low-cost material is available for the standard bag(S), and the profit contribution per standard bag can be increased to $20 per bag. (Assume the profit contribution of the deluxe bag(D) is the original $9 value)
c. New sewing equipment is available that would increase the sewing operation capacity to 750 hours (Assume 10S + 9D is the appropriate objective functions)
If each of these conditions is encountered separately, what are the optimal solution and the total profit contribution for each situation?

Question 3:
As part of a quality improvement initiative, government employees complete a three-day training programme on teamwork and a two-day training programme on problem solving. The manager of quality improvement requested that at least eight training programmes on teamwork and at least ten training programmes on problem solving be offered during the next six months. In addition, senior-level management specified that at least 25 training programmes must be offered during this period. A consultant is used to teach the training programmes. During the next six months, the consultant has 84 days of training time available. Each training programme on teamwork costs £10,000 and each training programme on problem solving costs £8000.
1. Formulate a mathematical model that can be used to determine the number of training programmes on teaming and the number of training programmes on problem solving that should be offered.
2. Graph the feasible region.
3. Determine the coordinates of each extreme point.
4. Solve for the minimum-cost solution.

Question 4

Refer to the Table 1 and do the following:

1. Calculate the Expected time, mean time.
2. Develop the Network diagram using the expected time and use PERT Analysis to know the mean and Sd of the project.
3. Based on these estimates and the resultant expected project duration of 69 days. The executive committee wants to know what is the probability of completing the project before a scheduled time of 68 days?
4. How do you measure project risk exposure? Explain and propose ways to reduce the project risk exposure.

 

Activity No

Task Name

 

Optimistic Duration(O)

Most Likely Duration(ML)

Pessimistic Duration(P)

Immediate Predecessor

1

Team meeting

 

0.5

1

1.5

 

2

Hire Contractors

 

6

7

8

1

3

Network Design

 

12

14

16

1

4

Order Ventilation system

 

18

21

30

1

5

Install Ventilation system

 

5

7

9

4

6

Order new racks

 

13

14

21

1

7

Install racks

 

17

21

25

6

8

Order power supplies and cables

 

6

7

8

1

9

Install power supplies

 

5

5

11

8,12

10

Install cables

 

6

8

10

8,12

11

Renovation of data centre

 

19

20

27

2,3

12

City inspection

 

1

2

3

2,5,7

13

Facilities

 

7

8

9

10

14

Operations/System

 

5

7

9

10

15

Operations/Telecommunications

 

6

7

8

10

16

System & applications

 

7

7

13

10

17

Customer service

 

5

6

13

10

18

Power check

 

0.5

1

1.5

9,10,11

19

Install test servers

 

5

7

9

1,2,13,14,15,16

20

Management safety check

 

1

2

3

5,18,19

21

Primary systems check

 

1.5

2

2.5

20

22

Set date for move

 

1

1

1

21

23

Complete move

 

1

2

3

22

Question 5

Read the attached papers and "results.pdf" carefully and discuss the following:

1. Project network diagram descriptions and their advantages.

2. Explain the procedure of developing the project model and discuss on the risk methodologies used in the paper.

3. Compare the resultsin the paper and"results. Pdf" documentprovide comments.

4. If distribution of the weather risk factor is modelled using uniform distribution, discuss and critically comment on the new results as compared to Point 3.

5. Comment on the sensitivity analysis to identify the influence of different risks on project durations and critical review the outcome.

Attachment:- Risk Management in Project.rar

Reference no: EM132882773

Questions Cloud

How much will have to pay each year : The account's balance will be 0 at the end of the sixth year. If the bank has promised Ms. Shouppe a 10% return, how much will they have to pay her each year?
Compute the dollar-value lifo cost of the ending inventory : Inventory Pools - Stone Shoe Company adopted dollar-value LIFO on January 1, 2019. Compute the dollar-value LIFO cost of the ending inventory
Domestic market and an international market : Differentiate between a domestic market and an international market
What is the size of monthly payment : The monthly mortgage payment on your house is $3,000. It is a 30 year mortgage at 6% compounded monthly. How much did you borrow?
Develop the network diagram using the expected time : Develop the Network diagram using the expected time and use PERT Analysis to know the mean and Sd of the project - Calculate the Expected time, mean time
How much will a new suburban cost five years from now : Assuming a 3% annual increase in the price of automobiles, how much will a new Suburban cost you 5 years from now, if today's price is $38,000?
What purpose does performance appraisal serve : What purpose does a performance appraisal serve? What are some key ideas to remember when conducting a performance appraisal?
What is the rate of return on the trust fund : Your grandfather placed $2,000 in a trust fund for you. In 10 years the fund will be worth $5,000. What is the rate of return on the trust fund?
How the hr strategies are shaped and developed : Evaluate Sainsburys how the HR strategies are shaped and developed in response to internal and external environmental factors

Reviews

Write a Review

Supply Chain Management Questions & Answers

  Supply chain network design for cwc

This assignment explain the supply chain management process of cwc. What is the current annual supply chain cost?

  Criteria when making new location decisions

Identify a number of the typical criteria used when making new location decisions

  Draw the project network

Determine the mean critical path for Brent's job search process. What is the variance of the project duration?

  Compare and contrast economic - market, and relevancy

Please compare and contrast economic, market, and relevancy value.

  Brushing up on inventory control

Health system in Pennsylvania

  Supply chain strategy

Supply chain strategy

  What is the economic order quantity for fans in units

Nittany Fans of Lewistown, Pennsylvania, is a distributor of industrial fans used in plants, warehouses, and other industrial facilities.

  What factors reduce the capacity of the organization

What factors reduce the capacity of the organization to get its objectives?

  What is the total annual cost

What is the total annual cost

  Supply chain management questions

Briefly define the following two supply chain metrics: (i) inventory turnover ratio and (ii) supply chain velocity.

  Explain the supply chain management concept

Explain the supply chain management concept, Differentiate between public and private sector organisations in terms of their supply chain objectives and strategies

  How warehouses can add value in the supply chain

How warehouses can add value in the supply chain

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd